Anhui Zhonglu Engineering Materials Co., Ltd. |
Verified Suppliers
|
|
HDPE Geomembrane Technical Parameter (GB standard) | |||||||
Spec Properties | GMS0.5 | GMS0.75 | GMS1.0 | GMS1.25 | GMS1.5 | GMS2.0 | GMS2.5 |
Thickness | 0.5mm | 0.75mm | 1.0mm | 1.25mm | 1.5mm | 2.0mm | 2.5mm |
Tensile Properties (each direction) (≥) .yield strength .break strength .yield elongation .break elongation | 7KN/m 10KN/m -- 600% | 10KN/m 15KN/m -- 600% | 13KN/m 20KN/m 11% 600% | 16KN/m 25KN/m 11% 600% | 20KN/m 30KN/m 11% 600% | 26KN/m 40KN/m 11% 600% | 33KN/m 50KN/m 11% 600% |
Density(≥) | 0.940g/cc | 0.940g/cc | 0.940g/cc | 0.940g/cc | 0.940g/cc | 0.940g/cc | 0.940g/cc |
Puncture Restistance (≥) | 120N | 180N | 240N | 300N | 360N | 480N | 600N |
Carbon Black Content | 2.0-3.0% | 2.0-3.0% | 2.0-3.0% | 2.0-3.0% | 2.0-3.0% | 2.0-3.0% | 2.0-3.0% |
Carbon black Dispersion | Noted(1) | Noted(1) | Noted(1) | Noted(1) | Noted(1) | Noted(1) | Noted(1) |
Tear Resistance (≥) | 56N | 84N | 115N | 140N | 170N | 2255N | 280N |
Oxidative Induction Time(OIT) Standare OIT(≥) | 60min. | 60min. | 60min. | 60min. | 60min. | 60min. | 60min. |
FAQ
1.Are you manufacturer or trade company?
We Zhonglu are a professional geosynthetic products manufacture, we
will provide you with top-class service.
2. What's the order process?
a.Inquiry--- The more detailed information you provide, the more
accurate product we could provide you.
b. Quotation---Resonable quotation with clear specifications.
c. Sample confirmation---Sample could be sent before the final
ordering.
d. T/T 30% in advanced, and the balance could be paid before
shipment.
e. Production---Mass production.
f. Shipping--- By sea, air or courier. Detailed picture of package
could be provided.
3. How long is your delivery time?
Generally it is 3-5 days if the goods are in stock. or it is 5-7
days if the goods are not in stock, it is according to quantity.
4. How does your factory do regarding quality control?
"Quality is priority." We always attach great importance to quality
controlling from the beginning to the end.
5.What's the payment method you accept?
T/T, L/C,D/P etc.