Home Companies Guangdong Fullde Electrical Technology Co., Ltd

3000KW 10.5KV Resistance UPS Load Bank Test , Diesel Generator Load Bank 

Guangdong Fullde Electrical Technology Co., Ltd
Active Member

Contact Us

[China] country

Address: Baisha 3rd Village Industrial Area, Humen Town, Dongguan City, Guangdong Province, China

Contact name:Alina

Inquir Now

Guangdong Fullde Electrical Technology Co., Ltd

3000KW 10.5KV Resistance UPS Load Bank Test , Diesel Generator Load Bank 

Country/Region china
City & Province dongguan guangdong
Categories Diesel Generators
InquireNow

Product Details

3000KW 10.5KV Resistance Medium Voltage Load Bank Test for Bank Date Center

 

Such equipment is used for testing the backup diesel generator of large data center.To ensure the continuous operation,UPS is required by large data center and backup generator unit is an important part to maintain the continuous power supply.Long time empty load or light load may easily lead to the carbon deposition of backup generator unit thus the capacity decreasing and failed start easily occurring.Therefore,the backup generator unit needs to be tested and maintained with such equipment.

 

Long time empty load or light load may easily lead to the carbon deposition of backup generator unit thus the capacity decreasing and failed start easily occurring.The product can be used for testing performance indicators of data center's generator unit,regularly check,repair and maintain generator unit.It is crucial for data center to guarantee power steady.

 

Specification
Rating voltage/frequency10.5KV/50Hz
Max Load PowerApparent Power: 3000kW
Load Resolutionstep:200KW
Power Factor1
Load Tolerance±5%
Fan Control Power190V/380V,50Hz/60Hz
Wire ConnectionLoad bank input——Copper bar
Control power input——Connector-bar
Max Protection GradeIP56
Way of WorkingContinuous Working
CoolingForced air cooling, horizontal inlet air and upwards exhaust cooling
TransportationHoisting
ColorRAL7032
Dimensions9000*2438*2591
Weight6000KG
AccessoriesSwitch: ABB, Siemens and Schneider, PLC: Panasonic and Siemens;
Operating Environment Parameter
Ambient Temperature-10℃~+50℃
Relative Humidity≤95%

 

Hot Products

1kw to 500kw Resistive Dummy Load Bank for Generator Testing Generator load bank testing is an ...
1kw to 1500kw Resistive Dummy Medium Voltage Load Bank for Generator Testing Main Functions: (1) ...
2000KW 6.9KV Medium Voltage Load Bank Protect Your Generator Features: 1.Excellent components 2...
3000KW 6.9KV Adjustable Medium Voltage Load Bank Escort Your Equipment Why need load bank testing? ...
3000KW 10.5KV Resistance Medium Voltage Load Bank Test for Bank Date Center Such equipment is used ...
Intelligent Medium Voltage Load Bank 10.5KV 2000KW Test for Date Center A load bank is a device ...