![]() Active Member
|
[China]
Address: 3-301 of Yangguang Shuncheng , Shunshi Road , Shizhong Disctrict, , Jinan
Contact name:SONG Pein
Jinan Darin Machinery Co., Ltd. |
Dog Food Beef Treats Cold Extruding Machine
Darin mainly focuses on pet food machine development and research. There are lots of patented machines. Such as pet food extruder machine, dog treats injection molding machine, soft treats making machine, automatic meat strip making machine, bird seed bar making machine, beef jerky treats making machine.
We are a member of APPA, USA (Every year we will attend it to learn the new product and provide the related machines. We are the deputy president Unit of the SDPIA (China internal Pet Food Association members) and the member of A High-Tech Enterprise of Shandong Province 2019. As the Supplier of Kellogg’s of USA,Bill & Melinda Gates Foundation, Wanpi, a public corp of China
1. Motors are from WEG, Germany, which has 3-year world-wide guarantee;
2. Electric parts are from ABB or Schneider, easy to find
replacments at local market;
3. PLC and touch screen are from Siemens, Germany to realize easier
operation and less labor quantity;
4. While faults occurred, relevant information will be displayed on
touch screen, easy to settle the problem;
5. Control cabinet has 24V safe voltage (not 220V), which could
protect the operator even electric leakage occurred;
6. Three kinds of protectors to keep machine and operator safe:
over-current protector, over-voltage protector and over-heat
protector;
7. All the cover body, mesh belt and parts touching with materials
or final products are made by stainless steel 304.
Technical Parameters
Output | Power | Required Worker | Voltage / Frequency | Dimension |
300-500kg/hr | 11kw | 2~3 | 380V / 50Hz | 15 x 6 x 3m |
Commissioning Service
1. We make accurate factory layout design according to customer’s
factory size; if the customer needed, we could make workshop design
with electricity power, water supply, gas power, material storage,
final storages, worker’s restroom, etc.
2. After delivering machines to the client’s factory, we start to
apply for the Visa to the client’s country immediately; normally
the vessel needs 20-60 days to the required port, so we have enough
time to get the Visa. While the machines arrive at your factory,
our engineers are ready to start the commissioning service.
3. 1-2 of our engineers will go to your factory to install and
adjust the processing line to realize normal production in the
shortest time.
4. Our engineers have the responsibility to train and teach the
workers how to operate, clean, maintain and repair all the machines
until the workers could well operate the processing line.
5. It normally costs 10 days for the commissioning
service, and we supply a 1-year guarantee from the date of
completion of commissioning service.
6. The engineer’s round-trip flight tickets, accommodation, and
daily salary of USD 100 are on the client’s account.