Home Companies Dongguan Zehui machinery equipment co., ltd

High Rebound Polyurethane Foam Production Line With PLC Digital Touch Screen

Dongguan Zehui machinery equipment co., ltd

Contact Us

[China] country

Trade Verify

Address: Industrial Zone of Tangshi, Gaobu town, DongGuan City GuangDong Province,China

Contact name:Wang

Inquir Now

Dongguan Zehui machinery equipment co., ltd

Verified Suppliers
  • Trust
    Seal
  • Verified
    Supplier
  • Credit
    Check
  • Capability
    Assessment

High Rebound Polyurethane Foam Production Line With PLC Digital Touch Screen

Country/Region china
City & Province dongguan guangdong
InquireNow

Product Details

 

Full Automatic High Rebound Polyurethane Foam Production Line With PLC Digital Touch Screen

 

Product Description
 
This equipment is used in soft PU products.Fomaing Density Range : 8-70kg/CBM. The ideal Foam products are involved with Furniture,Shoes,Bra and Electricals field,also suitable for Mattresses,Sofa,Package,Cloths and Car industry.User can save over two hundred different of recipes,To adust and change them by user at any time.user can remote control it by internet that reduce production cost scientific and directly.PLC Digital Touch Screen or Electric Control System.----This machine can change the formulation no need stop machine,no need test flow,The degree of resistance to yellow can reach 3~5 international standard,cooperate the customer's request to offer different formular,and training the foaming engineer.
 
For the process of foaming:


Loading all the raw materials inside the material tank with the loading system--control the temperature of the raw material inside the tank with the chiller--check the flow of all the raw materials before foaming--make some small sample test before foaming (make sure the flow and everthing is correct)--Put the karft paper and the plastic film-- foaming process


Main specification
 

ModelPass CaliberUseQtyBrand
K-301L/75DA cross valveG2″POP, PPG,CaCO3,Foam3Korea
K-301L/63DA p cross valveG1″TDI foam1Korea
K-301L/32DA cross valveG½″Other small material, Flame retardant, Anti-yellow9Korea
DK800 glass flow meter20-200 L/hAIR1China
FA10-15 glass flow meter40~400L/HH2O1

 
China

FA10-25F glass flow meter150~1500L/HMC1

 
China

FA10-25F glass flow meter600~6000L/HTDI1 
Transducer speed adjusted headΦ25*2000mmfoam1Qianghui

 
Material pot types: (The work pressure in the pot is normal pressure)

 

TypeUseSpecificationQty
Big material tankPPG5m³/δ5mmA3 steel plate, with temperature controlling, stirrer, filter system1
Big material tankPOP5m³/δ5mmA3 steel plate, with temperature controlling, stirrer, filter system

1
 

Big material tankCaCo35m³/δ5mmA3 steel plate, with temperature controlling, stirrer, filter system1
Big material tankTDI5m³/δ5mm A3 steel plate, with temperature controlling, stirrer, filter system

1
 

Big material tankFlame retardant2m³/δ3m stainless steel, with filter system1
Big material tankMC2m³/δ2mm stainless steel, with filter system1
Small material tankSi180L/δ1mm stainless steel1
Small material tankA-33180L/δ1mm stainless steel, with filter system1
Small material tankT9180L/δ1mm stainless steel, with filter system1
Small material tankH2O180L/δ1mm stainless steel1
Small material tankColor180L/δ1mm stainless1
Small material tankAnti-yellow180L/δ1mm stainless steel1
Small material tankBlack180L/δ1mm stainless steel1
Floor powder mixing tankPPG, POP, Powder1.5m³/δ3mmA3 steel plate, with filter system1
Filter tankPOP, Powder1.5m³/δ4mmA3 steel plate1

 

Our Services

1.We will help to design the layout of the machine that put in your factory.We will send 2-4 experience engineers to install and testing the machines.
2.We will teach your engineer how to operate the machine and how to maintain the machines.
3.We will give you the machine operation manual and the best formulation for target products that you are going to make.
4.We will help to buy the best raw material for making the foam if you needed.
 
Q: How many days for the install and testing of the machine?
 
A: After all the machine in your factory we will send 1-2 engineer help to install the machine you must send someone to help about 30 days installation will finished. After that one electrician and one foaming engineer will come to connecting the cable and run the machine in 15days. Total 45days the machine can be running.
 
Q: For the cost of the engineer how much I need to pay?
 
A: You need to pay USD50 one day for one engineer and also need to pay for the visa fee turn-round ticket fee and food hotel.
 
The main part of the machine


 

Hot Products

37KW Sponge Mattress Low Pressure Foaming Machine High Speed 220L / Mould Horizontal Automatic ...
Horizontal Continuous Foaming Production Machine For Sponge / Mattress This Foam Production Line is ...
Continuouse High Pressure Spray Foam Production Line for Pillow 60kg/m3 The ZHF-2017 Horizontal ...
Full Automatic High Rebound Polyurethane Foam Production Line With PLC Digital Touch Screen Product ...
Fully-Automatic Horizontal Continuous Polyurethane Foam Injection Machine With American Vicking Pump ...
High Effeiciency MattressFoam Production Line Full Automatic 200~300L/min Horizontal Automatic ...