Home Companies Jiangsu Zhongxinhe New Material Technology Co., Ltd.

RUB 30 A Heavy Duty Laminate Floor Underlay Shock Absorption For Wood Flooring

Jiangsu Zhongxinhe New Material Technology Co., Ltd.

Contact Us

[China] country

Trade Verify

Address: NO.28 XINCHUN ROAD JINDONG INDUSTRIAL PARK CHANGZHOU CITY, JIANGSU PROVINCE, CHINA

Contact name:James

Inquir Now

Jiangsu Zhongxinhe New Material Technology Co., Ltd.

Verified Suppliers
  • Trust
    Seal
  • Verified
    Supplier
  • Credit
    Check
  • Capability
    Assessment

RUB 30 A Heavy Duty Laminate Floor Underlay Shock Absorption For Wood Flooring

Country/Region china
City & Province changzhou jiangsu
InquireNow

Product Details

3mm Heavy Duty Rubber Underlay With Aluminum Film For Wood Flooring

 

Introduction:

  • 3 mm thick aluminum-foil-backed rubber vapor barrier underlayment with advanced moisture protection, shock absorption, and an adhesive strip with overlap film for ease of installation.
  • Highest in class sound impact and insulation ratings
    Solid rubber with advanced moisture protection and shock absorption
    Mold and mildew resistant
    Crush-resistant technology for stellar performance and longevity
    Includes adhesive strip and overlap foil film for connecting multiple rolls
    Installed with foil side facing down



Suitable area:
Laminate floor, wood floor, engineered floor, hardwood floor, floating floor, sub-floors, etc.

 

Roll Cover:10m2
Roll Width:1000mm
Roll OverlapN/A
Thickness3mm
Moisture Resistance Foilaluminum film
Material:Rubber
Antimicrobial:No
Moisture ResistantYes
Cushioning:Yes
Commercial / Residential:Residential

 

How to Install

Step 1: Clean Your Subfloor
Clean your subfloor using your broom and dustpan so that it is free of any foreign objects.

Step 2: Roll Out Your Underlayment
Roll your underlayment next to the wall. Start in the corner to keep it as even as possible across the room.

Step 3: Cut the Section
Once you have your underlayment firmly in place, cut the section using your scissors or utility knife.

Step 4: Roll Out the Next Section
Roll out the next section with the tape side over the overlapping film on the previous section.

Step 5: Butt Underlayment
Butt your underlayment sections together so that the tape side is flush up against the other piece of underlayment and on top of the overlapping film.

Step 6: Cut Section
Cut the next section of underlayment.

Hot Products

1.5mm IXPE Foam High Density With embossed For SPC Flooring moisture proofing IXPE makes great ...
3mm Heavy Duty IXPE Foam Underlay With Golden Film For Laminate Flooring Comfort Walking Introductio...
2mm Green IXPE Foam With PE Film For Laminate Floor Noise Reduction Introduction: Natural rubber ...
3mm Heavy Duty Rubber Underlay With Aluminum Film For Wood Flooring Introduction: 3 mm thick ...
3mm High-End Rubber Underlay With Golden Film For Laminate Flooring Introduction: Rubber is a high ...
2mm Heavy Duty Rubber Underlay With Aluminum Film For Water Proofing Introduction: Rubber is a high ...