Home Companies Dongguan Bto Environmental Protection Material Co., Ltd.

Cardboard Finished Floor Protection Cover Temporary Recycled For Construction Projects

Dongguan Bto Environmental Protection Material Co., Ltd.

Contact Us

[China] country

Trade Verify

Address: No.5, Jinsha Rd., Zhupingsha, Wangniudun Town, Dongguan City, Guangdong Province, China

Contact name:Kary

Inquir Now

Dongguan Bto Environmental Protection Material Co., Ltd.

Verified Suppliers
  • Trust
    Seal
  • Verified
    Supplier
  • Credit
    Check
  • Capability
    Assessment

Cardboard Finished Floor Protection Cover Temporary Recycled For Construction Projects

Country/Region china
City & Province dongguan guangdong
InquireNow

Product Details

Temporary recycled cardboard finished floor protection cover for construction projects

Heavy duty floor protection designed for commercial and residential contractors. Building floor protection paper has replaced the demand for large and bulky debris boards and can be laid flat. Protect the floor from splashing, falling, and other injuries.

 

It is a temporary floor protection that is sufficient to handle the toughest projects. It is lighter than the original roll, but still provides reliable protection against water, paint, and mud. It is twice thicker than building paper and can be reused, making it an ideal choice for temporary floor protection in residential or small commercial projects. It is easy to unfold and lay flat, allowing steam to escape while preventing overflow. It is very suitable for protecting hardwood, ceramic tiles, vinyl concrete, etc. It is easy to sew wooden boards together using tape.

 

The perfect protection solution is suitable for newly installed flooring that requires protection, while continuing to solidify and release moisture.

• Breathable materials

• Low sliding risk

• Unique high-strength performance

• Protect most floor types

• Protect high gloss flooring, such as ceramic, marble, or polished wood

• Protect the floor during the curing and drying stages

 

One of the most important preventive measures in any construction project is to ensure that the completed area remains in perfect condition. The floor of a building faces a huge risk of damage between the equipment, materials, and human flow involved in the construction. From large commercial projects to medium-sized renovation projects, Almost all construction projects need temporary ground protection to avoid scratches and stains.

 

Procedure for laying floor protection boards for construction

Splash prevention

  • Anti slip and durable working surface
  • 60 hour splash prevention technology
  • Prevent liquid overflow

 

Quick fit

  • Horizontal and vertical measurements
  • Easy and fast installation
  • Accurate cutting and folding, no waste

 

Cut and Fold

  • Flat and fast
  • Easy to install and handle

Minimally -100% recycled, environmentally friendly, stain free, unbleached

Widely used in architecture, construction, and professional or DIY renovation projects, it provides excellent protection for all surfaces (such as floors, carpets, walls, doors and windows) when any type of decoration, repair, or construction project occurs

 

 

Application

 

  1. Maintain the floor of the work site from damage and debris, providing reusable and reversible surface protection for professional builders and craftsmen
  2. Protect concrete, marble, granite, and other counter surfaces
  3. Universal floor protection to provide cushioning for wood, ceramic, and vinyl flooring during construction
  4. Protect hardwood, tiles, linoleum, and carpets from damage during construction or renovation processes
  5. Protecting sinks and bathtubs during construction or renovation
  6. Protecting walkways and decks during house maintenance

 

NameHome Temporary Floor Protection
Model Number38''×100'/Roll
Material100% recycled fibers
Cardboard Rolls DataPaper, Ply-fibers, Reinforcers
ColourBrown
Weight17KG
Outdoor UseNo
Indoor UseYes

 

BTO Flooring Protection Paper Installation.pdf

 

Contractors and/or installers should determine the appropriate way to install and use the product based on the described situation. If it is to be used, first determine how much paper is needed to cover your surface, unfold the floor protection paper to cover the edges, and then use breathable tape or seam tape to attach the seams. Finally, fix the floor protection paper in place with adhesive tape. In addition, if using tape, ensure that the surface is clean and the tape is firmly fixed to the floor. Consult the flooring manufacturer for recommended tape. Pre use testing.

 

 

 

 

 

 

 

GET A QUOTE NOW AS BELOW CONTACT!

 

Thanks & Regards!

BTO / Kary
Dong Guan Bto Environmental Protection Material Co.,Ltd
Add: 1, No.5 Jinsha Rd. Zhupingsha, Wangniudun, Dongguan, Guangdong, China
Cell/Wechat/WhatsApp: 0086 13728826316
Email: btoholding@yeah.net

www.btoepm.com

 

Hot Products

Temporary Floor Protection Materials For Construction Projects, Heavy-Duty Floor Protection Paper ...
Temporary recycled cardboard finished floor protection cover for construction projects Heavy duty ...
Heavy Construction Project Temporary Floor Protection Materials Temporary Waterproof Floor ...
Heavy Construction Floor Protection Paper, Temporary Waterproof Floor Protection Cover Paper Floor ...
Heavy Construction Project Ground Protection Paper, Decoration Finished Floor Protection Material ...
Construction Floor Protection Paper, Heavy-Duty Waterproof Floor Protection Covering Paper Roll When ...