Anhui Sinomining Machinery Co., Ltd |
CLF Coarse Particle Flotation Machine From Professional Mineral Machine Manufacture
Introduction
Flotation machine is applicable to grading of non-ferrous and
ferrous metal, also applicable to grading of nonmetals, such as
coal, fluorite and talc. The impeller of flotation machine is
driven by motor v-belt, centrifugal effect is thus produced and
negative pressure is formed, which, on the one hand, absorbs
adequate air to mix with ore pulp, and on the other hand, stirs the
ore pulp and mixes the ore pulp with medicines and refine bubbles;
thus, the minerals will be adhered to the bubbles and float to the
pulp surface and form foam layer. Adjust the opening of flash board
and cone valve and control the liquid level to make the useful
bubbles scraped out by scraper blade. For selection of flotation
machines, the following information shall be indicated: Models,
specifications and number of flotation cells. Number of scraper
blade devices (left or right). Single-side scraping or double-side
scraping. Numbers of feed boxes, middling boxes, tailing boxes,
feed pipes and middling pipes. Liquid level can be controlled
manually, electrically or automatically. Deployment diagram of
flotation technological process should be provided.
Features
Coarse-particle pneumatic flotation machine is used for separating non-ferrous metal, ferrous metal and chemical materials. It is suitable for grading of coarse particles but can also handle the grading of fine particles, which means it is for flotation of all particle sizes. It has the following feature: adopting new-type impeller-stator system and installed with cell with forced circulation passage consisting of false bottom and grid plate, a whole new ore pulp circulation mode, a stable separation area and foam layer are formed under the function of impeller, circulation passage. It provides fine hydromechanical conditions, and improves the load capacity of mineralized bubbles and particle size of ore grinding under flotation. For common flotation machines, the handing range of particle size is 0.01-0.15mm, but it can reach 0.4-0.7mm, thus overcoming the shortcoming of other flotation machines in terms of poor flotation effect of coarse feeding. In addition, the concentration of ore pulp which returns to the impeller area is low with fine particle size, which reduces the wear of impeller and stator. Its aeration performance is good and power consumption is low.
Coarse-particle pneumatic flotation machine is composed of motor and driving mechanism, and equipped with the cell with circulation passage, false bottom and grid plate, stator and impeller mechanism made up of impeller, air distributor, hollow spindle and bearing body.
CLF coarse particle flotation machine is divided into two types:
green cell and suction cell, which can be selected according to the
flotation process.
Parameter
Models Item | CLF-2 | CLF-4 | CLF-8 | CLF-16 | |||
Effective volume | 2 | 4 | 6 | 16 | |||
Dimensions of cell (L x W x H) | mm | 1200×1600 | 1600×2100 | 1900×2500 | 2500×3200 | ||
×1250 | ×1500 | ×1950 | ×2400 | ||||
Production capacity | m³/min | 0.5-2 | 1-4 | 1-6 | 4-16 | ||
Air inflow | m³/(m2.min)) | 1.5 | 1.5 | 1.5 | 1.5 | ||
Spindle motor | Models | Suction cell | Y160M-6 | Y200L-8 | Y200L2-6 | Y280S-6 | |
Green cell | Y132M2-6 | Y180L-8 | Y200L-8 | Y280S-8 | |||
Power | Suction cell | 7.5 | 15 | 22 | 45 | ||
Green cell | 5.5 | 11 | 15 | 37 | |||
Suction cell | 790 | 730 | 790 | 730 | |||
Rotating speed | Green cell | 790 | 730 | 730 | 730 | ||
Impeller | Diameter | Suction cell | 460 | 620 | 750 | 790 | |
Green cell | 410 | 580 | 645 | 750 |
Why choose our company machine?
Q1: Hi, are you a mining machinery manufacturer?
Answer: Yes, we are a professional manufacturer of mining machine.
Our company welcomes customers to visit our factory at any time.
Q2: How long is the warranty period of your equipment? Does your
company provide spare parts?
Answer: The warranty period of our machine is one year. For those
wearing parts, we guarantee to provide high-quality parts for a
long time.
Q3: How long does it take to deliver?
Answer: Production usually starts after receiving the advance
payment. Small machine is guaranteed to be delivered within one
month. Large-scale machine is guaranteed to be delivered within 2-3
months.
Q4: Do you provide machine operation guidance?
Answer: Yes. We have professional engineers for installation,
commissioning and operation guidance.