HEBEI TALIN TRADING CO.,LTD |
|
Size2*1*1m galvanized anti-corrosion ecological stone cage box
Galvanized gabion net is an ecological grid structure. The gabion net is made of high-corrosion, high-strength, ductile low-carbon steel wire or the above steel wire covered with PVC using mechanical weaving. The diameter of the edge wire of the gabion net is generally larger than the diameter of the wire. The twisted part of the double wire is generally twisted to ensure that the metal coating and PVC coating of the steel wire in the twisted part are not damaged.
Common specifications and model parameters
Type | double twisted woven wire mesh |
Hole Shape | hexagonal |
Material | Low carbon steel wire ,heavy galvanized wire ,galfan wire ,pvc coated wire |
Aperature | 6×8cm ,8×10cm,10×12cm ,12×15cm |
Size (L×W ×H) | 2x1x1m, 3x1x1m, 4x1x1m, 2x1x0.5m, 4x1x0.5m,5.2×1×0.5m ,3×1×0.5m ,6×2×0.3m |
Wire Guage | 2.0mm-4.0mm |
Surface Treatment | Galvanized /PVC Coated |
Application | Food control ,retaining wall |
Features | corrosion resistance ,easily assembled |
Color | silver or black/green ,ect |
Steps of using gabion net
TGalvanizing is a one-time forming production, in addition to the
cover plate, the side plate, the end plate, and the bottom plate
are inseparable. Length/width tolerance (±5%) height tolerance
(±5%), the interior is separated into independent units by
partitions every 1 meter.
Using the assembly method, the cover plate, side plate, end plate
and bottom plate are separately produced and assembled into a cage,
and each part is wound and bound with spiral steel wire.
Good combination: easy to process and transport, can be bundled
into various shapes according to design requirements, and adapt to
the shapes of hillsides, beaches and embankments.
FAQ:
A: We are factory. We are manufacturer of Wire Mesh .
A: Generally it is 5-10 days if the goods are in stock. or it is 10-15 days if the goods are not in stock, it is according to quantity.
A: Yes, we could offer the sample for free charge but do not pay the cost of freight.
A: Payment<=100000USD, 100% in advance.
Payment>=100000USD, 30% T/T in advance ,balance against copy of
B/L.