Home Companies Dongguan chengkang mold plastic co., ltd

New Energy Automotive Heater Plastic Injection Mouldings Single Cavity Top Cover PA66 Mold Direct Runner Two Plate Mold

Dongguan chengkang mold plastic co., ltd
Active Member

Contact Us

[China] country

Address: Building 6 and 9, Jinxia Yifang Industrial Zone, Chang 'an Town, Dongguan City

Contact name:Rapha

Inquir Now

Dongguan chengkang mold plastic co., ltd

New Energy Automotive Heater Plastic Injection Mouldings Single Cavity Top Cover PA66 Mold Direct Runner Two Plate Mold

Country/Region china
City & Province dongguan
Categories Moulds
InquireNow

Product Details

New Energy Vehicles Battery Blue Heater Box Top Cover Plastic Injection Mould Tooling

Specifications:

NameNew Energy Vehicles Battery Blue Heater Box Top Cover Plastic Injection Mould Tooling
MaterialPA66+GF

Dimension

Customized
applicationcar battery

Working Temperature

-20~200℃
Surface Treatmentsandy finish

Housing Color

Black/Blue

Standard

LKM
Weight510g
Mould Precision+/-0.05mm
CertificateISO

package

Carton(61*29*47cm)
Production Capacity5000/month

Life span

500000/2yrs
Origindongguan china

 

Feature Of Plastic Injection Mold

- Plastic injection mold
- cover or Lid parts
- PP material
- 1*4 injection mold
- H13 (HRC48-52) Steel
- YUDO Hot runner
- Full hot runner
- Automatically running
- HASCO standard
- Short cycle time

 

1, Start from part design analysis.

2, Mold design drawing and DFM report available so you can see how is the mold going to be before mold making.

3, If product is complex, moldflow report will be present as well.

4, In house mold making shop ensure you mold quality under well control.

5, Normally it takes 20-40 days to make mold, precise time depends on part design.

 

 

FAQ

Q:What is your company superiority?

A:First,we have 23 years plastic mould and parts customized experiences,Second,we have efficiency with 90 personnel and first-rate-facilities.Third,our staff would treat all customer welcoming,Fourth we can make plastic parts that other companies might not to make.Fifth,our price is favorable.

 

Q:How is your efficiency?

A:We need 30 days around to make plastic parts and mould,and need 7 days around to send the products to you.

Hot Products

New Energy Vehicles Battery Heater Box Plug Plastic Injection Mould Tooling Specifications: Name New ...
New Energy Vehicles Battery Blue Heater Box Top Cover Plastic Injection Mould Tooling Specifications...
New Energy Vehicles Battery Blue Heater Box Top Cover Plastic Injection Mould Tooling Specifications...
New Energy Vehicles Battery Blue Heater Box Plastic Injection Mould Tooling Specifications: Name New ...
New Energy Aluminum Alloy Heat Dissipation Mold Injection Heater Shell Iml Inside Mold Injection ...
New Energy Vehicles Battery Heater Box Plug Plastic Injection Mould Tooling Quick detail Of Plastic ...