Home Companies Wuxi Superclean Equipment CO., LTD

IQC Medical Dust Free Workshop Epoxy Floor Sterile Clean Room

Wuxi Superclean Equipment CO., LTD
Active Member

Contact Us

[China] country

Contact name:Alice

Inquir Now

Wuxi Superclean Equipment CO., LTD

IQC Medical Dust Free Workshop Epoxy Floor Sterile Clean Room

Country/Region china
InquireNow

Product Details

 

 

 Medical production dust-free workshop

 

New energy vehicles are supported by national policies, so the development is very good these years. As the main power source of new energy vehicles -- batteries, batteries are divided into many kinds. There are lead-acid batteries, lithium batteries and nickel-metal hydride batteries

At present, more and more automobile manufacturers choose lithium battery as the power battery of new energy vehicle.

Lithium battery production, what requirements does the workshop have?

Generally, Lithium battery production workshops must meet the following conditions

First, completely enclosed clean workshop, to create good quality

The production workshop adopts the completely enclosed dust-free workshop, which can strictly control the temperature, humidity and dust of the environment in the production process, thus ensuring the excellent quality of the product.

Second, scale, automatic production capacity, to create quality products

 

The use of advanced automatic production equipment at home and abroad to minimize the incidence of defective products and ensure a stable manufacturing level and supply capacity.

Third, each process should control quality perfect.

each production line should have quality inspector do tracking detection, provide customers with safe and reliable products through the means of the incoming quality control (IQC), process quality control (IPQC), outgoing quality control (OQC),customer service

 

 

 

Manage lithium battery warehouse, do you know the requirement?

As lithium is a kind of metal that is particularly prone to chemical reactions, it is easy to explode and burn if improper handling with the process of packaging and transportation, accidents also occur from time to time, the warehouse management  are the following requirements:

1. basic Requirements

(1) lithium battery are dangerous goods; In order to ensure the safety of transportation, all lithium batteries (group) shall pass the UN38.3 test;

(2) due to lithium battery characteristics, the storage environment should be within 18-25 degrees.

(3) humidity requirements: effectively control warehouse humidity to avoid long-term extreme humidity (relative humidity is higher than 90% or lower than 40%).

(4) the lithium battery warehouse shall be separated by brick walls, and the warehouse shall be closed, explosion-proof or b equipped with other corresponding safety electrical lighting equipment.

(5) where inflammable and explosive goods are stored shall be equipped with sufficient variety of fire-fighting equipment and always in good condition.

(6) the places with lithium batteries must be prohibited from smoking

(7) it is not allowed to carry out operations that may cause fire near warehouses or places where inflammable and explosive articles are stored

2. Storage requirements

(1) batteries should be stored in well-ventilated, dry and cool places with high temperatures and humidity that may damage battery performance and/or corrode battery surfaces.

(2) the battery carton shall not be piled up beyond the specified height. If too many battery cartons are stacked together, the batteries in the bottom carton may be distorted and may leak liquid.

(3) batteries should not be stored or displayed in sunlight or exposed to rain.When the battery is showered, the insulation resistance decreases and self-discharging and rust may occur. Temperatures rising can damage batteries.

(4) the batteries will be stored and displayed in the original packaging. The batteries will be stacked randomly after the packaging is removed, which will cause short circuit and damage to the batteries

(5) articles that are easy to cause combustion and explosion and those with different fire fighting methods should be stored separately

3.Transportation requirements:

(1) when carrying out material, whatever tools are used, should be properly handled to prevent material falling or damage.

(2) load, lamination and directivity should be considered during material handling.

(3) when using forklift or cart, the loading method should be heavy first and then light. The materials being transported should not exceed the width and height of passageway and elevator door, and the speed should be moderate.

(4) the transporter should use qualified transportation tools (forklift, cart, etc.).

(5) the battery cardboard box should be carefully loaded and unloaded. Rough handling may lead to short circuit or damage of the battery, which may lead to liquid leakage, explosion or fire.

4. Processing Requirements

(1) lithium (original) batteries can be used for public waste treatment if they are not in conflict with local regulations.

(2) do not remove the battery.

(3) do not fire the battery except with an approved controlled furnace

5. other requirements

(1) the warehouse personnel shall check the cargo information every day. If the storage position is not correct, the account items are inconsistent, and quality problems are timely reported and dealt with, fire inspection shall be conducted at the end of work or after work, and power supply shall be cut off.

(2) clean and tidy the warehouse area every day, timely clean up the dirt and debris on the ground, and arrange the materials in the warehouse to the designated area to meet the requirements of neatness, neatness, cleanliness, hygiene and reasonable placement.

(3) keep the safe passageway in the warehouse unimpeded, eliminate accumulation and ensure the safety of personnel.

(4) the planning areas in the warehouse to have a clear identity, the material is put in to village store classification points, and have a clear identity.

 

 

 

 

The environment and construction of Lithium battery production workshop should follow the principle of the advanced technology, the overall planning, rational layout, economical, safe and reliable, high quality, reducing energy consumption. Wuxi Yijing will provide comprehensive, perfect environmental control engineering as a whole solution, from project design, construction, testing, training, after-sale and so on

A: sandwich plate structure engineering and surface coating engineering

Sandwich Board

In order to ensure the air tightness of the structure of the production workshop, the interval wall and ceiling panels are basic sandwich panel which in conformity with the national fire protection standard. It is have a strict requirement  for the flatness, insulation, the structure, refractory limit, plate thickness, compressive strength .According to the requirements of the design, It can use manual double-layer glass magnesium rock wool color steel plate, manual magnesium oxide sandwich panels, rock wool color steel plate, manual rock wool color steel plate etc.

clean Closer Door

According to the design, it can be used steel close - door, aluminum frame close - door, stainless steel close - door.

Clear window

According to the design, it can use double glass airtight window, aluminum frame single glass airtight window, stainless steel frame single glass airtight window, etc.

Floor Coating

According to the design, it could use epoxy resin self-flow flat, epoxy resin coating flat, PVC color cosmetics floor, etc.

Hvac engineering solution

B.Dehumidification purifying ventilation pipe

In order to achieve the environmental control index of the production workshop, the ventilation pipe should be made from high quality galvanized steel sheet or stainless steel plate according to the national construction specification. All pipes and accessories should be clean, dry, airtight and sealed

·       Piping for refrigeration and air-conditioning equipment

·       According to the design scheme, the pipes are made from high-quality galvanized steel pipe, seamless steel pipe, PPR pipe and other materials according to the national construction specifications for refrigeration equipment, heating equipment, air conditioning equipment, dehumidification equipment and cooling equipment

C.Electromechanical engineering solutions

Lighting system power distribution system

According to the requirements of the design, lighting lamps and light sources are provided to meet the illumination requirements of the workshop. The lamps can be equipped with LED clean lamps, three-color clean lamps, explosion-proof clean lamps, etc., and the installation of wiring pipes can be carried out according to the requirements of national construction specifications.

Power distribution system of equipment

Install power distribution system for production equipment and public equipment according to the requirements of the design plan. Install low-voltage power distribution (box) cabinet, bus bar, bridge, cable, socket and other materials.

Weak current automatic control engineering

According to the requirements of the design plan, carry out the installation of wiring and piping according to the national construction specifications for the network, communication, monitoring, and automatic control projects of the production workshop.

D.Utility piping

Production equipment piping

As required by the design scheme, provided compressed air pipeline, nitrogen pipeline, vacuum pipeline, electrolyte pipeline, cooling water pipeline, etc for production equipment and public equipment. The quality galvanized pipe, seamless steel pipe, stainless steel pipe, PPR pipe, tetrafluoroethylene pipe and other materials can be used for wiring and piping installation according to national construction specifications.

Material pipeline.

According to the requirements of the design scheme, piping is provided for the pulping system equipment, and sanitary seamless stainless steel pipe and other materials can be used for wiring and piping installation in accordance with national construction specifications.

Water supply and drainage pipeline

According to the requirements of the design scheme, supply pipes, drainage pipes, etc for production equipment and public equipment, and the installation of wiring pipes and pipes can be carried out by using quality galvanized pipes, PVC pipes and other materials according to the national construction specifications

 

 

 

 

Hot Products

E-Clean Dust-Free Cleanrooms E-Clean builds and designs dust-free cleanrooms ranging from FS209E ...
Medical production dust-free workshop New energy vehicles are supported by national policies, so the ...
E-Clean Dust-Free Cleanrooms E-Clean builds and designs dust-free cleanrooms ranging from FS209E ...
Clean Room Accessories Cleanroom Doors Our cleanroom doors are compatible with any level of ...
Clean room Construction Materials E-Clean Cleanroom Construction Materials Steel plate sandwich ...
Electronics industry customized clean room with air shower, electronics factory medical production ...