Home Companies shanghai metal forming machine co.,ltd.

Tube Former

shanghai metal forming machine co.,ltd.
Active Member

Contact Us

[China] country

Address: Factory Add: Buiding D, 299 Tangming Road, Songjiang district, Shanghai China

Contact name:pan shuli

Inquir Now

shanghai metal forming machine co.,ltd.

Tube Former

Country/Region china
City & Province shanghai shanghai
InquireNow

Product Details

I Advantages. 
1.1 Special mould for various tube diameters, very easy to change and adjust, no needs crane or too much manpower. 
1.2 Large diameter range
1.3 Roll shear system. 
1.4 PLC computer control, convenient operation
1.5 Light and small, suitable for site work. 
1.6 internal seam tube forming

II Main technical data
2.1 Diameter of round tubes: 100mm ~ 1400mm. 
2.2 Max. Tube length: Unlimited. 
2.3 Thickness of strip: 
0.35-1.0mm(Galvanized steel)
0.30-0.6mm(Stainless steel)
0.35-1.0mm(Aluminum)

2.4 Width of strip: 137mm
2.5 Strip speed: 1~40m/min, adjustable
2.6 Suitable strip material: Aluminum, stainless steel, galvanized steel, etc. 
2.7 Dimension: 3200mm x 2200mm x 2580mm (can be loaded in one 20' container, 
2.8 Weight: 2300kg
2.9 Power of main motor: 5.5kw, 380Volt, 50Hz
2.10 Power of water motor: 90 w
2.11Pneumatic tank Pressure 0.5— 0.7Mpa (compressor)
III Main configuration
3.1 Decoiler mechanical expanding type
3.2 Control system: Transducer, JAPAN mitsubishi- PLC control
3.3 Driving system: Spiral subulate gear type decelerator (low noise, large moment)
3.4 Hydraulic system: Electromagnetism valves are from Taiwan or imported from famous companies. 
3.5 Material of forming rollers: GCr15 bearing steel, quenched, HRC58-62
IV Accessories accompanied with the machine
4.1 Unloading rack: One set, For 4000mm long tube
4.2 Shear blade: Two pieces (including one piece on the machine)
4.3 Four press-adjusting rollers (changed to suit different thickness)
4.4 20m special steel strip for making strip mould
4.5 One set of special tools.

Hot Products

Main features 1.Very easy and quick to change the diameter of spiral tube. 2.Any length can be cut ...
Guarantee: within two years since the date of B/L, Before deliver you could send one technician to ...
Guarantee: within two years since the date of B/L, Before deliver you could send one technician to ...
Guarantee: within two years since the date of B/L, Before deliver you could send one technician to ...
Guarantee: within two years since the date of B/L, Before deliver you could send one technician to ...
I Advantages. 1.1 Special mould for various tube diameters, very easy to change and adjust, no needs ...