Home Companies Jinzhou City Shitan Machinery Equipment CO. LTD.

Construction Exploration Deep Borehole 200 Meters GK 200 Water Well Drilling Rig Machine

Jinzhou City Shitan Machinery Equipment  CO. LTD.

Contact Us

[China] country

Trade Verify

Address: Xiaoshang Village,Jinzhou City,Hebei province,China

Contact name:Anna

Inquir Now

Jinzhou City Shitan Machinery Equipment CO. LTD.

Verified Suppliers
  • Trust
    Seal
  • Verified
    Supplier
  • Credit
    Check
  • Capability
    Assessment

Construction Exploration Deep Borehole 200 Meters GK 200 Water Well Drilling Rig Machine

Country/Region china
City & Province jinzhou hebei
InquireNow

Product Details

Construction Exploration Deep Borehole 200 Meters GK 200 Water Well Drilling Rig Machine

 

 

Product Description

 

It is widely used for Water well drilling, Geological Exploration and Prospecting, Geothermal wells, Blast-hole, Irrigation projects, etc.. High-way and building construction foundation drilling, genetal survey. Geophysical exploration and blast hole drilling 

 

Technical Specification 

 

ST-200 Drilling Rig
DrillSwivel Head

Drilling depth

 

Max.200m

Spindle speed

 

(4-speed)

115 230 505 1010r/m

Hole diameter

 

Max.300mSpindle stroke450kmm
Drill rod diameter42mmSpindle pull-downMax.15KN
Angle range90-75Spindle lifting capacityMax. 25KN
Oil pumpWater pump
ModelYBC-20/125ModelHorizontal reciprocating single-acting piston pump
Rated pressure12.5MpaWorking pressureMax. 1.2Mpa
Flow speed20ml/r  
Rated speed2000r/min  
HoistPower(diesel)
Max. lifting capacity20KNModel(diesel engineZS1115
Hoisting drum revolution20.39.85.170r/mRated power16.2KW
Drum diameter140mmRated speed2200r/m
WEIGHTAROUND 600KG
SIZE1730*860*1360mm

 

Product Advantages

 

1. Hydraulic feeding mechanism can improve drilling efficient,reducing labor work

2. The rig equipped with a ball on a cassette holding mechanism and a six driving drill pipe.double guide,the drilling rod can be replaced without shutdown ------------high efficient,convenient operation,safe and reliable

3. Equipped with hole bottom pressure indicator, you can know the situation inside the hole

4. The drilling machine has the advantage of compact structure,small volume, light weight,convenient move, suit for mountain and plain areas.

 

Instructions for use of drilling and coring machine

 

1) To ensure safe and normal operation, read the instructions before use, and get familiar with the structure and use of the drill. 2) After the drilling rig moves to the position where it needs to work, swing the traveling wheel 180 degrees backward, and operate the handle to make the traveling wheel and the steering wheel leave the ground. Adjust the four adjusting bolts to make the base firmly on the working position. At this time, the base plane is off the ground. 3) Wipe the drill column and lifting screw, and adjust the spindle position. 4) Connect the water pump to the water source and add water to the bucket to ensure that the water pump can supply water normally. 5) Install the upper drill bit. 6) Check and adjust all parts of the engine according to the requirements of the gasoline engine operation manual. If the engine is in normal condition, the engine can be started. Start drilling and coring.

 

 

 

Hot Products

100 Meters Water Well Drilling Rig Machine XY-1 XY-1 Water Well Rig Description XY-1 drilling rig is ...
New Condition Trailer Mounted geotechnical borehole Water Well Drilling Rig Product Description ...
Hydraulic Diesel Engine 200m Deep Water Well Borehole Drilling Rig For Exploration Sample Collecting ...
200 Meters Investigation Borehole Blasting Water Well Drilling Rig Machine For Exploration GK 200 ...
Construction Exploration Deep Borehole 200 Meters GK 200 Water Well Drilling Rig Machine Product ...
Qualtiy Red Mounted Boring Borehole Water Well Drilling Rig Sell to South Africa Competitive ...