Home Companies Jinzhou City Shitan Machinery Equipment CO. LTD.

Min Air Compressor Water Well Drilling Rig Machine

Jinzhou City Shitan Machinery Equipment  CO. LTD.

Contact Us

[China] country

Trade Verify

Address: Xiaoshang Village,Jinzhou City,Hebei province,China

Contact name:Anna

Inquir Now

Jinzhou City Shitan Machinery Equipment CO. LTD.

Verified Suppliers
  • Trust
    Seal
  • Verified
    Supplier
  • Credit
    Check
  • Capability
    Assessment

Min Air Compressor Water Well Drilling Rig Machine

Country/Region china
City & Province jinzhou hebei
InquireNow

Product Details

Min Rotary Speed Air Compressor Equipped Hammer Water Well Drilling Rig Machine

 

 

Product Introduction

 

This Water Well Drilling Rig Machine can be used in all kinds of strata, such as water well engineering, geothermal well, anchor pile hole, etc. It has the advantages of hydraulic control of the whole machine, automatic loading and unloading of drill pipe, crawler chassis, high-power diesel engine, hydraulic balance at four corners, and stronger terrain adaptability.

 

Product Parameter:

 

Total Weight (kg)180
Hole diameter (mm)100-219
Hole depth (m)150
Drilling direction45-90°with the ground
Disposable drilling depth (mm)1500
Rotary speed (r/min)0-62
Working pressure (Mpa)0.8-2.1
Air consumption (m3 / min)13-21
Matching power (kw)7.5

 

Product Features:

 

1. Flexible mobility. Extensive use of the region.

 

2. Functional diversity, stand wear and tear, energy saving and high efficiency.

 

3. Electric and diesel hybrid can choose, more power.

 

4. Hydraulic rod lifting, more labor-saving operation.

 

5. A variety of drill bits, to help you deal with all kinds of terrain.

 

The manufacturer of rock exploration machinery reminds you of the following precautions during the operation of well drilling rig:


1. Before drilling, the drilling rig shall be constructed in strict accordance with the hole position, orientation, angle, hole depth, etc
2. When installing the drill pipe, ensure that the drill pipe is not blocked, bent or cracked.
3. When clean water is used for drilling, water supply is not allowed before drilling, and pressure drilling can be carried out only after the water returns. Sufficient flow shall be ensured, and dry hole drilling is not allowed. When there is much rock powder in the hole, the water volume shall be increased to extend the pump start time, and the drilling can be stopped only after the hole is effectively flushed.
4. During the drilling process, the distance shall be accurately measured. Generally, the drill pipe must be measured every 10 meters of drilling or when the drilling tool is changed, and the hole depth shall be verified and relevant records shall be made. 5. Then check whether the gearbox, shaft sleeve, horizontal and vertical shaft gear have overtemperature phenomenon and abnormal sound. If any problem is found, stop the machine immediately to check and find the cause and deal with it in a timely manner. Don't stop and leave the problem unsolved, which will lead to rapid mechanical damage over time and high maintenance costs.

 

 

Hot Products

Trailer Mounted Rock Core Drilling Machine , Well Water Drilling Equipment Well Water Drilling ...
High Drilling Efficiency 75mm Core Geotechincal Water Well Drilling Rig Machine With 200 Meters ...
Diesel Power Type ST100 Portable Water Borehole Well Drilling Equipment Product Description: This ...
Min Rotary Speed Air Compressor Equipped Hammer Water Well Drilling Rig Machine Product Introduction ...
100-300m Depth Hard Rock Drilling Machine For Rock Stone Coal Mine Drilling Brief Introduction We ...
Electric Portable Borehole Core Drilling Machine For Water Well Drilling Water Well Drilling ...