Home Companies Henan Dowell Crane Co., Ltd.

Full Span Launcher Crane 600T Girder Erection Machinery 3 Phase 380V 50hz

Henan Dowell Crane Co., Ltd.
Active Member

Contact Us

[China] country

Address: Economic Development Area, XinXiang city, Henan province, China.

Contact name:June Chao

Inquir Now

Henan Dowell Crane Co., Ltd.

Full Span Launcher Crane 600T Girder Erection Machinery 3 Phase 380V 50hz

Country/Region china
City & Province xinxiang henan
InquireNow

Product Details

600T Girder Erection Machinery Full Span Beam Launcher Equipment

 

Product Description

 

600T Girder Erection Machinery Full Span Beam Launcher Equipment merges an adaptation of a wide range of work, excellent performance, convenient operation, safety structure into a single whole. It has the steel structure of rail type precast beam hoisting rack equipment. This product can be used not only in plain construction, but also to meet the construction of mountain highway slope, small radius curved bridge, skew bridge and tunnel bridge requirements.

 

Hydraulic System Operation

  • The two ball-type globe valves on the same hydraulic cylinder must be closed or opened at the same time. Never open only one of the periods and close the other, otherwise it will cause an accident or even cause the hose to burst or the hydraulic cylinder to be damaged;
  • Determine the setting value of the relief valve according to the different working conditions of the middle and rear three outriggers and the lifting beam jack of the double beam crane operating the front and pressure systems, but the maximum value should not exceed 31MPa. After setting, use a nut to lock it. If it is too small, it will often overflow during work, causing the oil temperature to rise or even fail to work. If the setting pressure is too large, it will not provide safety and damage the components. The specific setting value is determined by the on-site technicians;
  • When the oil temperature exceeds 70 ℃, the machine should be stopped for cooling. When the oil temperature is lower than 0 ℃, it should be considered to replace the low-temperature hydraulic oil;
  • If any component or pipeline fails, the machine should be stopped immediately. The fluid of the bridge crane should be inspected and repaired by a trained professional technician. Operators must not dismantle it without authorization.

Notes On Operation

 

Before the electromechanical starting equipment of the Girder Erection Machinery Full Span Beam Launcher Equipment , the operator must carefully check the various parts that are fastened and lubricated, and make all the preparations before startup according to the operating regulations before starting to use. During the operation of the machine, the Girder Erection Machinery Full Span Beam Launcher Equipment should be monitored at all times. If abnormal conditions (such as severe vibrations, abnormal sounds, abnormal odors, leaks, temperature, pressure, etc.) are found during the operation of the various departments and the status of the instrument's indication signals, the Girder Erection Machinery Full Span Beam Launcher Equipment should be stopped and inspected; when the machine is not stopped, it should not touch the rotating parts and perform maintenance. When repairing and welding the steel structure of the working device, it is prohibited to use the machine body as a ground wire and provide protection during welding; electrical equipment must be repaired by a full-time electrician, and the power must be cut off before repairs, and a "prohibited closing" sign or send someone to guard the gate to prevent accidental power transmission; the power supply voltage must be the same as the rated voltage of the electrical equipment. All electrical equipment should be installed and qualified electric shock protectors on the line. The steel structure shall adopt protective zero connection and lightning and anti-induction devices; the oil used in the hydraulic system shall comply with the type and brand of hydraulic oil specified in the relevant instructions, keep the hydraulic oil clean, and the temperature of the hydraulic oil shall be maintained in the range of 30-80 degrees During use, control the oil temperature as much as possible, and do not exceed the allowable upper limit.

 

Parts Of Crane

 

 

Package & Delivery

 

Hot Products

Truss Type Bridge Erection Machine Girder Launcher Crane With Hydraulic System Product Description ...
Railway Bridge Girder Launcher Crane For Precast Beam Installation Product Description Railway ...
500T Beam Girder Erection Launcher Cursed Bridge Construction Crane Product Description 500T Beam ...
400 Ton Bridge Girder Erection Crane For Highway And Railway Construction Product Description In ...
600T Girder Erection Machinery Full Span Beam Launcher Equipment Product Description 600T Girder ...
300 Ton Concrete Lifting Crane Bridge Girder Launcher For Metro Product Description 300 Ton Concrete ...