Home Companies Henan Dowell Crane Co., Ltd.

Electric Overhead Bridge Crane For Workshop Metal Structure High Altitude Operation

Henan Dowell Crane Co., Ltd.
Active Member

Contact Us

[China] country

Address: Economic Development Area, XinXiang city, Henan province, China.

Contact name:June Chao

Inquir Now

Henan Dowell Crane Co., Ltd.

Electric Overhead Bridge Crane For Workshop Metal Structure High Altitude Operation

Country/Region china
City & Province xinxiang henan
InquireNow

Product Details

120 Ton Double Girder Electric Overhead Bridge Crane For Workshop

 

Product Description

 

120 Ton Double Girder Electric Overhead Bridge Crane For Workshop operating room separate type, closed type, thermal insulation three. The platform entrance of the control room of the double-beam bridge crane can be divided into three types: side, end and top. H is the height increased by the buffer of the big car. Double beam bridge crane indoor, indoor two kinds. When ordering, the technical requirements of the higher and lower temperature of the working environment and the type of power supply shall be indicated.

The overload limiter, large screen display and various protective devices are added to the double-beam bridge crane to some extent, which further increases the safety in the use process. 120 Ton Double Girder Electric Overhead Bridge Crane For Workshop is generally used in the air operation mode, it is different from other ground operation crane. There is a single small operating room under the double-beam bridge crane, and the ground operation is carried out by the operator by remote control.


Design advantages of Double Girder Electric Overhead Bridge Crane


1. 120 Ton Double Girder Electric Overhead Bridge Crane For Workshop is the first to design honeycomb beam, with light weight, large load, strong wind resistance and other characteristics

2. Unique steel pin connection, not only solid and reliable, but also short assembly time.

3. Flexible strut, the site can be turned into a single piece, convenient transportation.

4. Small installed capacity solves the difficulty of electricity consumption in field construction.


Installation specifications of Double Girder Electric Overhead Bridge Crane


The trolley has passed the test in the factory. In slightly adjusted to eliminate transport after deformation, therefore, can be directly on the bridge on the shelf in the bridge installed in accordance with the related technical conditions, under the condition of the trolley you have three legs no (namely the trolley only three wheels in contact with the track, the other a dangling), otherwise, want to be in dangling wheel bearing box or track padded under adjustment, under the pad can be only one layer, padded under the orbit must be placed in the main girder steel plate, welding on both ends fixed.

  • The metal structure of the various inspection indicators according to the provisions, in order to reduce the amount of high-altitude operation, the installation of equipment, wiring and so on as far as possible in the ground.
  • The crane must be installed in accordance with the following method before erection, if found the problem to eliminate in time, if the user can not deal with please immediately contact the factory, when the crane erection on the factory, the factory can not deal with this kind of problem.

Parts Of Crane

 

 

Hot Products

15 Ton QC Model Double Girder Electromagnetic Overhead Crane Product Description 15 Ton QC Model ...
Steel Mill 30T QDY Double Girder Bridge Overhead Casting Crane Product Description Steel Mill 30T ...
Outdoor QB Type Wireless Remote Control 10T Explosion Proof Overhead Crane Product Description ...
Factory Power Rail 5 Ton Single Beam Harga Overhead Crane With Hoist Product Description Factory ...
120 Ton Double Girder Electric Overhead Bridge Crane For Workshop Product Description 120 Ton Double ...
50 ton Ladle Foundry and Casting Steel Mill Double Girder Overhead Crane Product Description 50 ton ...