Guangzhou C.Y. Machinery Parts Trading Co., Ltd. |
Verified Suppliers
|
|
Details For Mitsubishi Bus S6B2 Diesel Engine Piston:
MITSUBISHI S6B-2 Appliion: BUS No. CyI: 6 Diameter: 135.0MM | |||||
Piston | OEM No. | Compress Height | Total Length | Pin Size | Feature |
36217-70700 36617-61100 | 87.9 | 152.7 | 55x111.5 | w/al-fin | |
Piston Ring | OEM No. | Size1 | Size2 | ||
36217-17010 | 4.0K+3.0+6.0 | ||||
Cylinder Liner | OEM No. | Size | Flange | ||
36207-12100 | 135.0x154.0x268.0 | 163.0x12.0+1.0 | |||
Engine Bearing | OEM No. | Main Bearing | Con Rod Bearing | Bush | |
36209-40010 | 36219-12100 | ||||
Engine Valve (IN) | OEM No. | Head Diameter | Stem Diameter | Total Length | |
48.0 | 10.0 | 180.0 | |||
Engine Valve (EX) | OEM No. | Head Diameter | Stem Diameter | Total Length | |
44.0 | 10.0 | 180.0 | |||
Valve Seat | OEM No. | ||||
Valve Guide/Sub Parts | OEM No. | ||||
S6B2 engine rebuild kit piston ring liner gasket bearing valve
S6B2 overhaul kit excavator
S6B2 rebuild kit excavator MITSUBISHI
S6B2 engine overhauling parts
piston | S6B2 | full gasket kit |
PISTON RING | S6B2 | overhauling kit |
piston kit | S6B2 | valves |
piston ring | S6B2 | valves seats |
cylinder liner | S6B2 | valves guides |
sleeve | S6B2 | valve springs |
cylinder liner kit | S6B2 | tappet |
cylinder head | S6B2 | push rod |
cylinder block | S6B2 | power steering pump |
engine assy | S6B2 | crankshaft |
cylinder head gasket | S6B2 | camshaft |
main bearings | S6B2 | con rods |
con rod bearings | S6B2 | MITSUBISHI ENGINE PARTS |
con rod bushing | S6B2 | MITSUBISHI SPARE PARTS |
camshaft bushing | S6B2 | MITSUBISHI DIESEL |
thrust bearings | S6B2 | MITSUBISHI EXCAVATOR |
water pumps | S6B2 | EXCAVATOR ENGINE PARTS |
Oil pump | S6B2 | EXCAVATOR PARTS |
clutch disc | S6B2 | EXCAVATOR DIESEL ENGINE |
clutch plate | S6B2 | MITSUBISHI REBUILD KIT |
clutch bearing | S6B2 | MITSUBISHI OVERHAUL KIT |
clutch facing | S6B2 | MITSUBISHI ENGINE PARTS |
starter | S6B2 | MITSUBISHI SPARE PARTS |
alternator | S6B2 | MITSUBISHI DIESEL |
gasket | S6B2 | MITSUBISHI EXCAVATOR |
full gasket kit | S6B2 | EXCAVATOR ENGINE PARTS |
overhauling kit | S6B2 | EXCAVATOR PARTS |
valves | S6B2 | EXCAVATOR DIESEL ENGINE |
valves seats | S6B2 | MITSUBISHI REBUILD KIT |
valves guides | S6B2 | MITSUBISHI OVERHAUL KIT |
valve springs | S6B2 | MITSUBISHI ENGINE PARTS |
tappet | S6B2 | MITSUBISHI SPARE PARTS |
push rod | S6B2 | MITSUBISHI DIESEL |
power steering pump | S6B2 | MITSUBISHI EXCAVATOR |
crankshaft | S6B2 | EXCAVATOR ENGINE PARTS |
camshaft | S6B2 | EXCAVATOR PARTS |
con rods | S6B2 | EXCAVATOR DIESEL ENGINE |
oil filter | S6B2 | MITSUBISHI REBUILD KIT |
fuel filter | S6B2 | MITSUBISHI OVERHAUL KIT |
air filter | S6B2 | piston |
solenoid | S6B2 | PISTON RING |
fan belt | S6B2 | piston kit |
V belt | S6B2 | piston ring |
piston | S6B2 | cylinder liner |
piston pin | S6B2 | sleeve |
piston kit | S6B2 | con rod bushing |
piston ring | S6B2 | camshaft bushing |
cylinder liner | S6B2 | thrust bearings |
sleeve | S6B2 | water pumps |
cylinder liner kit | S6B2 | Oil pump |
cylinder head | S6B2 | engine assy |
cylinder block | S6B2 | cylinder head gasket |
Q. Which countries have you exported?
ASIA: Iraq, UAE, Turkey, Thailand, Malaysia, Indonesia, Vietnam, Bangladesh, Kuwait, Lebanon
EUROPE: Russia, Kazakhstan, Greece, Norway, Ireland
OCEANIA: Australia, Fiji, Kiribati, New Caledonia
AMERICAS: Canada, Jamaica, Brazil, Peru, Chile,
AFRICA: Angola, South Africa, Kenya, Tanzania, Zambia, Sudan, South Sudan, Egypt, Algeri, Nigeria
Q: How can I get a quotation?
A: A complete quotation based on the details as follows in your
inquiry:
1. Part No. 2.Engine model 3.Machinery model 4. Description and
size
Picture. 6.. Quantity 6. Other requirements, such as Packing, Shipping and so on.
Q: 4. When can you deliver after sending deposit?
It depends on your order quantity, if we have stock then need about
3~10 working days get it ready, if no stock we will start to
produce when the deposite received. Usually it takes 15-60 days for
different items.
Q: How do you pack the goods?
We have 20 years experience on export, finished products will be
carefully handled by three steps:
1: Wrapped with packing paper or plastic bag;
2: HKT / FUP box or neutral box;
3: Put in an appropriate carton box or wooden boxes and be fixed
firmly.
Q: How can I know the status of my order?
We will keep you udpate the process of the preparation, to ensure
all issues are resolved prior to the delivery.products pictures can
be provided if required. We shall send out the goods immediately
after confirmation and you will get the tracking information right
away
Q: How to guarantee your service?
A. Strict inspection during production
B. Strictly check the products before shipment to ensure our packaging in good condition
C. Track and receive feedback from customer regularly
Q: What will you do for quality complaint ?
A. We will respond to customer within 24 hours.
B. Our QC will retest the same stock item, if confirmed it is quality problem, we will make corresponding compensation