Home Companies China Construction Machinery Imp&Exp Co., Limited

Shantui Bulldozer D08 SD42 SG18 Key Ignition Switch , Key Starter Switch

China Construction Machinery Imp&Exp Co., Limited
Active Member

Contact Us

[China] country

Address: 15F DIAMOND INTERNATIONAL, WORLD TRADE CENTER XUZHOU

Contact name:Jason

Inquir Now

China Construction Machinery Imp&Exp Co., Limited

Shantui Bulldozer D08 SD42 SG18 Key Ignition Switch , Key Starter Switch

Country/Region china
City & Province xuzhou jiangsu
InquireNow

Product Details

 Shantui Bulldozer D08 SD42 SG18 Key Ignition Switch ,  Key Starter Switch

 

 

SHANTUI START SWITCH D250000000 SD16 SD22 SD32 SD08 SD42 SG18 GARDER SHANTUI BULLDOZER D2500-00000 START SWITCH

 

Product name

oil pressure sensor 

Part no

D250000000

Model No.

 SD22

Company Advantage

10 Years in Excavator Bulldozer Genuine OEM Parts with Absolutely Competitive Prices

Packing

Wooden Case/Pallet/ Customized

Stock

YES

 

Ranges:

To assure it is the exact part you demand, pls advise your machine brand & model, or offer

 the Part NO. Thank you!

Mainly parts: Cab, filter, radiator, hydraulic radiator, boom cylinder, arm cylinder, bucket  cylinder, blade lift oil cylinder, tilt cylinder, water pump, fuel pump, steering pump, work pump,

 main pump, oil pump, transmission pump, fuel injector, final drive ass’y, travel  motor ass’y, starting motor ass’y, main valve, service valve, blade control valve, steering  valve, safety valve, transmission valve, solenoid valve, valves, pins, turbochargers,  monitor, CAB, link, bushing, plate, ring repair kit, bucket teeth, guard, shim, seal, pin,  cover, undercartridge spare parts: track roller, carrier roller, front idler, track link, track shoe, 

Excavator & Bulldozer spare part.

 

Packing methods:

 

Delivery:

-Q: How do deliver the goods?
 -A: by sea/by train/by air, we'll recommend the best way for you depends on goods quantity.

WEIGHT RECOMMENDED TRANSPORT MEANS TRANSPORT TIME COMMENTS
<50kg express-UPS/DHL/FEDEX
door to door service 3-7 days fast
convenient
expensive
50-150kg by air 3-10 days fast;
economic;
consignee has to do customs clearance
150>kg by sea 10-50 days slow;
economic;
it takes some time for customs declarance and clearance
2x20' or 1x40' by rail 20-35 days slow;
economic;
it takes some time for customs declarance and clearance;
only full container load accepted( MOQ:2x20' or 1x40' )

Hot Products

Donaldson / SANY Excavator Air Filter Replacement with Wire Mesh Construction SANY Excavator spare ...
SHANTUI SD32 Bulldozer Hydraulic Tilt Cylinder , Tilt Cylinder for Forklift SHANTUI SD32 bulldozer ...
Bulldozer Parts Digital Voltage Meter for SD08 / SD11 / SD13 SHANTUI Bulldozer SHANTUI BULLDOZER ...
SD22 Engine Oil Pressure Sensor Shantui Bulldozer Spare Parts CE ISO9001 Shantui bulldozer SD22 oil ...
Electrical System SD22 Shantui Bulldozer Parts Chronograph D2170 - 00000 Shantui bulldozer parts/HOT ...
Shantui Bulldozer D08 SD42 SG18 Key Ignition Switch , Key Starter Switch SHANTUI START SWITCH ...