Home Companies China Construction Machinery Imp&Exp Co., Limited

New Shantui SD22 bulldozer Parts steering brake assembly 23Y-17B-00000

China Construction Machinery Imp&Exp Co., Limited
Active Member

Contact Us

[China] country

Address: 15F DIAMOND INTERNATIONAL, WORLD TRADE CENTER XUZHOU

Contact name:Jason

Inquir Now

China Construction Machinery Imp&Exp Co., Limited

New Shantui SD22 bulldozer Parts steering brake assembly 23Y-17B-00000

Country/Region china
City & Province xuzhou jiangsu
InquireNow

Product Details

Shantui Bulldozer SD22 bulldozer steering brake assembly 23Y-17B-00000

 

Shantui Bulldozer SD22 bulldozer steering brake assembly 23Y-17B-00000/Shantui Bulldozer Parts

1. Updated product design

2. Optimized materials selection

3. Advanced manifacturing process and production technology

4. All are in the line with global standards

5. By long time testing, proved to be excellent

 

1

 Bulldozer series

SD13,SD16,SD22,SD23,SD32,SD42…

2

 Bulldozer series

D60.D85.D155.D275.D355…,D6D,D7G…

 

Ranges:

To assure it is the exact part you demand, pls advise your machine brand & model, or offer

 the Part NO. Thank you!

Mainly parts: Cab, filter, radiator, hydraulic radiator, boom cylinder, arm cylinder, bucket  cylinder, blade lift oil cylinder, tilt cylinder, water pump, fuel pump, steering pump, work pump, main

 pump, oil pump, transmission pump, fuel injector, final drive ass’y, travel  motor ass’y, starting motor ass’y, main valve, service valve, blade control valve, steering  valve, safety valve, transmission valve, solenoid valve, valves, pins, turbochargers,  monitor, CAB, link, bushing, plate, ring repair kit, bucket teeth, guard, shim, seal, pin,  cover, undercartridge spare parts: track roller, carrier roller, front idler, track link, track shoe, Excavator

 & Bulldozer spare part.

Delivery:

-Q: How do deliver the goods?
 -A: by sea/by train/by air, we'll recommend the best way for you depends on goods quantity.

WEIGHT RECOMMENDED TRANSPORT MEANS TRANSPORT TIME COMMENTS
<50kg express-UPS/DHL/FEDEX
door to door service 3-7 days fast
convenient
expensive
50-150kg by air 3-10 days fast;
economic;
consignee has to do customs clearance
150>kg by sea 10-50 days slow;
economic;
it takes some time for customs declarance and clearance
2x20' or 1x40' by rail 20-35 days slow;
economic;
it takes some time for customs declarance and clearance;
only full container load accepted( MOQ:2x20' or 1x40' )

Hot Products

Donaldson / SANY Excavator Air Filter Replacement with Wire Mesh Construction SANY Excavator spare ...
Shantui Bulldozer Parts Water Pump with Solid Steel Material FCC / SGS / ISO9001 Shantui bulldozer ...
Construction Vehicle Control Blade Switch Valve , Shantui Bulldozer Spare Parts Shantui bulldozer ...
Steering and Brake Assy Shantui Bulldozer Parts for SD08 / SD13 / SD22 Shantui bulldozer spare parts...
Shantui Bulldozer shantui 701-34-11002 blade lift valve shantui spare parts for new bulldozer ...
Shantui Bulldozer SD22 bulldozer steering brake assembly 23Y-17B-00000 Shantui Bulldozer SD22 ...