Home Companies ChangSha Zoomwolf Machinery CO.,LTD

High Wear Resistance Boom Tube Concrete Placing Pump Step Speed Or Stepless Speed

ChangSha Zoomwolf Machinery CO.,LTD
Active Member

Contact Us

[China] country

Address: Yinpen South Road,Yuelu District,Changsha City,Hunan Province,China

Contact name:Ms.fu

Inquir Now

ChangSha Zoomwolf Machinery CO.,LTD

High Wear Resistance Boom Tube Concrete Placing Pump Step Speed Or Stepless Speed

Country/Region china
City & Province changsha hunan
Categories Pumps
InquireNow

Product Details

High Wear Resistance Boom Tube Concrete Placing Pump Step Speed Or Stepless Speed
 
Features
Optimal design of boom-&column-structure ,Inner hydraulic oil tank renders a compact placement.

The key components of hydraulic- and electrical-system are from world famous brand,which ensure safety and stability.
 
For option:
1. Standard types without counter weight
2. Floor or shaft climbing
3. Step speed or stepless speed(proportional control)
4. Column length:5m,8m,10m
5. Delivery pipes for option as project budget:
⑴ Ordinary single straight pipe and cast steel bend,service life not more than 20,000m3 ;
⑵ High wear resistance double straight pipe and bend,service life not less than 50,000m3;

 

Technical Specifications
Model of placing boomHGY36S-4RHGY36P-4RHGY36SC-4RHGY36PC-4R
PerformanceMax. radius (m)36
Free standing height,Slewing range22.7m,400°
Working temperature(℃)0~60℃
Counter weight(kg)/2930
Total weight(kg)2500027930
Supply power to equipment380V/50Hz
Electric motorMotor modelY2-200L-4
Power(kW)30
Hydraulic systemSystem pressure(MPa)32
Flow(L/min)34473447
Oil tank capacity(L)280
Control mode(Cable+Radio) remote control
Clearing mode for concrete pipeWater clear / Dry clear
Section of tubular column (m×m)0.75×0.75
Arm(Booms)Boom modelfully hydraulic foldable arms
Delivery pipeline diameterDN125mm
Length of end hose (〃×m)5〃×3
The first sectionLength(m)12.3
Articulation-2.5°~82.5°
The second sectionLength(m)7.9
Articulation0°~180°
The third sectionLength(m)7.9
Articulation0°~180°
The forth sectionLength(m)7.9
Articulation0°~180°
ClimbingClimbing modeCylinder Jack Lifting
Internal climbing step distance(m)0.52
Floor frameHole prepared in floor
Shaft frameSize of climbing shaft : 2.0m-2.7m
Min. space between internal climbing frameClimbing(m)3
Placing concrete(m)6
Rest(m)6

 

What must be paid attention to when changing the conveying pipe of the placing boom?
First, the new tube and the old tube specifications are the same; Second, as the seal ring aging, do not re-use after disassembly; Third, if there is pressure inside the pipe (such as pipe blocking or pipe changing in the middle of pumping), pressure relief measures must be taken to release the pressure before the pipe lamp can be removed.
 



 
About the model
HGY ×× S or P C or blank - × R
  ①   ②     ③        ④              ⑤
 
① Hydraulic concrete distributor
② Round number of Max.radius(m)
③ Step speed regulation(S)or
Proportional control speed regulation(P)
④ With(C)or without(blank) counter weight
⑤ Arm section number ×Roll folding(R)
 
Identification letter description
S: Step-speed adjustment
P: Proportional (Stepless speed regulation)
C: Counter weight
 
The sample
1. Model HGY33S-3R means:
Without counter weight,max.radius 33m,step speed regulation and 3 roll-folding arms.
2. Model HGY33PC-4R means:
With counter weight,max.radius 33m, proportional control speed regulation and 4 roll-folding arms.
 

 

Hot Products

Safety Hydraulic Concrete Placing Boom / Tower Boom Pump Floor Or Shaft Climbing Features Optimal ...
Concrete Placing Boom Simple Floor Climbing Frame Structure Structural characteristic of ZOOMWOLF ...
Professional Hydraulic Concrete Placing Boom Internal Hydraulic Oil Tank Structural characteristic ...
Stable Boom Pressure Concrete Pump Easy To Disassemble And Install Structural characteristic of ...
High Wear Resistance Boom Tube Concrete Placing Pump Step Speed Or Stepless Speed Features Optimal ...
Construction Buildings Hydraulic Concrete Placing Boom Standard Types Features Optimal design of ...