Shandong Fengbao Metal Products Co., Ltd |
Verified Suppliers
|
|
15CrMoG Alloy Pipe Sch40 Astm A333 Gr 6 Seamless Alloy Steel Pipe High Quality P11 Alloy Steel Pipe
Main production process of hot-rolled seamless steel pipe (△main
inspection process):
Tube billet preparation and inspection△→tube billet
heating→perforation→tube rolling→pipe reheating→fixed (reduced)
diameter→heat treatment△→finished tube
straightening→finishing→inspection△(non-destructive, physical and
chemical, bench inspection)→in storage
Specification
Item | Alloy Steel Seamless Pipe |
Processing Service | Bending, Welding, Decoiling, Punching, Cutting |
Material | Seamless Steel |
Certificate | API, CE, Bsi, RoHS, SNI, BIS, SASO, PVOC, SONCAP, SABS, sirm, tisi, KS, JIS, GS, ISO9001 |
Length | 5.8m-12m or as your request |
Application | liquid delivery,Structure pipe,construction,oil gas pipe |
Payment terms | 30%TT Advance + 70% Balance |
FAQ
Q1. Are you a manufacturer or trader?
We are a manufacturer, and we can have our own factory produced many steel products.
Q2. Whether your company supports Trade Assurance order?
Yes, we can (100% product quality protection; 100% on-time shipment protection; 100% payment protection)
Q3. Can we get the some samples? Any charges?
Yes, you can get available samples in our stock. If the samples from new production, we will charge some reasonable cost, but this amount will be deducted from your first order.
Q4. How do we build up business relations with your company?
Send us your requirement which includes size, coating info, parameters, quantity, destination .
Q5. What is the MOQ?
We can accept small orders.Please feel free to contact us, we can meet your requirements.
Q6. What's your advantage?
With high-quality products and efficient customer service, we adhere to the principle of customer first.
Q7. How long is your delivery time?
Delivered within 15 days after receipt of deposit.