Shenzhen CODT technology co.,Ltd |
Verified Suppliers
|
|
we67k 125 3200 cnc hydraulic press brake with delem da66t controller 4 axis or 6 +1 axies EHC1025
Essential details
No. | Name | Specification | Measure Unit |
1 | A (Length) | 3060 | mm |
2 | B (Width) | 1530 | mm |
3 | C (Height) | 2630 | mm |
4 | D (Installation width) | 2500 | mm |
5 | E (Throat depth) | 295 | mm |
6 | F (Opening height) | 470 | mm |
7 | G (Distance between lower and upper table) | 350 | mm |
8 | H (Upper table height) | 915 | mm |
9 | Capacity | 100 | ton |
10 | Bending length | 2500 | mm |
11 | Stroke | 200 | mm |
12 | Back gauge stroke | 500 | mm |
13 | Total power | 12.65 | kw |
14 | Total weight | 6.5 | ton |
15 | Number of axis | 6+1 | axis |
16 | Accuracy of axis Y1/Y2 | ±0.01 | mm |
17 | Accuracy of axis X | ±0.01 | mm |
18 | Accuracy of axis R | ±0.1 | mm |
19 | Accuracy of axis Z1/Z2 | ±0.1 | mm |
20 | Approach speed of axis Y1/Y2 | 200 | mm/s |
21 | Bending speed of axis Y1/ Y2 | 0.2-15 | mm/s |
22 | Return speed of axis Y1/ Y2 | 200 | mm/s |
23 | Moving speed of axis X | 500 | mm/s |
24 | Moving speed of axis R | 62 | mm/s |
25 | Moving speed of axis Z1/Z2 | 700 | mm/s |
26 | Hydraulic oil | 180 | L |
1. Key Components Configuration List
No. | Name | Set | Manufacture |
1 | CNC Controller | 1 | STEP(Italy) / Delem (Netherlands) |
2 | Foot switch | 1 | KACON(Korea) |
3 | Terminal module | 3 | JRT(China) |
4 | Circuit breaker | 1 | SCHNEIDER(Germany) |
5 | Circuit breaker Switch | 1 | SCHNEIDER(Germany) |
6 | AC contactor | 1 | SCHNEIDER(Germany) |
7 | Relay | 1 | SCHNEIDER(Germany) |
8 | Relay socket | 1 | SCHNEIDER(Germany) |
9 | Power supply | 1 | DELTA(Taiwan) |
10 | Servo hydraulic system(Y axis) | 2 | EKO(China) |
11 | Motor driver + Servo motor (Back gauge) | 4 | MITSUBISHI(Japan) |
12 | Sensor | 3 | OMRON(Japan) |
13 | Screw + Rail(back gauge) | 6 | HIWIN(Taiwan) |
14 | Bearing | 7 | NSK(Japan) |
15 | Crowning system | 1 | EKO(China) |
16 | Frame + Sliding table | 1 | EKO(China) |
17 | Servo reducer | 2 | HARMONIC (Japan) |
18 | Motion controller | 2 | STEP(Italy) / Delem (Netherlands) |
19 | Key switch | 1 | KACON (Korea) |
20 | Emergency stop switch | 1 | KACON (Korea) |
21 | Buzzer | 1 | KACON (Korea) |
22 | Power Indicator | 1 | KACON (Korea) |
4. Main structure and working principle
The machine is a 6+1 axis (Y1, Y2, X, R, Z1, Z2 and Crowning system) hydraulicpress brake.Adopting advanced close-loop of value controlled synchronized technology. The servo motor is used to control the pumps. EKO's unique design makes the equipment more efficient, energy-saving and stable. It is mainly composed of the following components:
Frame body
EKO independently designed and adopted the finite element analysis
method to ensure the strength, rigidity and safety of the machine.
The frame is welded with high-quality steel plate and stress is
eliminated by heat treatment. The frame is thick, rigid and
shock-absorbing. The column, working slider and lower worktable of
the machine are finished by large CNC boring and milling machine.
Ensure the perpendicularity and parallelism of all installation
surfaces.
Back gauge system
The assembly unit comprises lifting component, sliding table
component, material retaining component, etc. The positioning
system of back gauge of the machine tool is all driven by a servo
motor through precision screw rod, can quickly reach the specified
position, up to micron-level precision, finally realize full
automation and improve the working efficiency.
Mould components
The assembly unit consists of the upper and lower mould assembly.
The upper mould is fixed on the upper table by the clamping device;
the clamping device provided by the device realizes quick loading
and unloading of moulds through a mechanism. The clamping device is
provided with a wedge trimming mechanism for locally modifying the
bending angle so that the angle of workpiece is changed within the
tolerance range. The lower mould, together with the mould sea and
rail guide, is arranged on the lower table.
5. CNC Controller
Delem and STEP Controller please reference by the documents of DA-66T_English, DA-69T_English and STEP_English.
6. Hoisting and installation
(1)Hoisting
The center of gravity of the machine is slightly forward and on the
high side, so it is necessary to pay attention to the position of
center of gravity of the machine tool during lifting, handling and
installation so as to avoid overturning of machine tool. During
hoisting, the lifting appliance must be fixed on the hoisting hole
of machine tool for vertical hoisting. For transportation, the
equipment must be firmly fixed with a bandage.
(2)Installation and leveling
As indicated in the attached drawing (foundation drawing), make the
machine tool installation base in advance, put the machine tool on
the base, and install the foundation bolts and foot-pad steel
plate. Meanwhile, confirm the level of the rack, with the lower
table surface as the baseline. Adjust the bolts of base anchor to
make the levelness in the vertical and horizontal
direction≤1000:0.20. To adjust the levelness of machine tool in
both vertical and horizontal direction to reach the requirement.
(3)Requirements for external connection cable
For the safety of machine and operators, a 100A three-phase air
circuit breaker must be installed 2 for externally connected power
supply, and the cable is required to be 4-core RV wire ≥10mm . In
addition, the grounding device needs to be set independently and
cannot be shared with other electrical circuits, with resistance
value ≤ 4 Ω.
7. Maintenance
Specifications on daily maintenance of hydraulic press brake.
In order to ensure good performance and precision of equipment
during production, guarantee product quality, reduce maintenance
frequency and prolong the service life, it is required to strictly
carry out daily inspection items, e.g., dust and rust removal,
moisture prevention, lubrication, screw tightening, etc.
Sliding table bearing and lifting bearing shall be lubricated, checked and tightened, and lubrication oil replaced every two months (oil grease resistant to 200℃ high temperature shall be used).
Major parts such as the screw rod, siding rail, mould seat, upper and lower table shall be subject to dust and rust removal every two days;
Movable parts, such as screw rod, guide rail, shall be lubricated, checked and tightened every month.
Electrical parts shall be subject to dust removal, checked and
tightened once a week.
EKO Equipment Co.,Ltd. is a high-tech and environment-friendly
sheet metal CNC press brake manufacturer. The product technology
comes from the "blood" of the international industry.
EKO has four series of high-quality press brake: "ES", "EHII", "ET"
and "ESS". There are strong technological strength, innovative
equipment development concepts, the professional development team,
self-core technology and numbers of new technological innovation
patents. The market covers all over the world.
EKO pays attention to the construction of enterprise culture,
builds enterprise culture brand, and integrates enterprise culture
into products. EKO adhere to the principle of "continuous
improvement and continuous innovation" to build a self-contained
system. Adheres to the quality policy of "customer satisfaction is
our pursuit, quality assurance is our commitment", which is guided
by customer needs and based on high-quality products to ensure
product quality. Continue to provide customers with high-precision,
high-efficiency, safety, stable, energy-saving,
environmentally-friendly sheet metal processing machine.EKO
Equipment Co.,Ltd. is a high-tech and environment-friendly sheet
metal CNC press brake manufacturer. The product technology comes
from the "blood" of the international industry.
EKO has four series of high-quality press brake: "ES", "EHII", "ET"
and "ESS". There are strong technological strength, innovative
equipment development concepts, the professional development team,
self-core technology and numbers of new technological innovation
patents. The market covers all over the world.
EKO pays attention to the construction of enterprise culture,
builds enterprise culture brand, and integrates enterprise culture
into products. EKO adhere to the principle of "continuous
improvement and continuous innovation" to build a self-contained
system.
Adheres to the quality policy of "customer satisfaction is our
pursuit, quality assurance is our commitment", which is guided by
customer needs and based on high-quality products to ensure product
quality. Continue to provide customers with high-precision,
high-efficiency, safety, stable, energy-saving,
environmentally-friendly sheet metal processing machine.
FAQ:
How long does it take to deliver the machine?
Generally, we will deliver the goods within 30 days. If the machine belongs to non-standard customized products, the time will be longer, but the longest time will not exceed 50 days.
What kind of payment do you accept?
Generally, we accept T/T and L/C payment, 30% deposit and 70% payment before delivery. If you are our special customer, we can accept better payment method.
What is the warranty period of your machine?
For conventional machines, our warranty period is one year. For special non-standard machines, we may provide a 2-3 year warranty, but this should be confirmed with our sales team in advance. During the warranty period, we provide free replacement parts.