Home Companies Shanghai Sunshine Industry Technology Co., Ltd.

Carbon Steel Wind Turbine Tower Transition Piece

Shanghai Sunshine Industry Technology Co., Ltd.
Active Member

Contact Us

[China] country

Address: C Building, 888, Huanhu West Second Road, Lingang New Area, China (Shanghai) Free Trade Experimental Zone

Contact name:leo

Inquir Now

Shanghai Sunshine Industry Technology Co., Ltd.

Carbon Steel Wind Turbine Tower Transition Piece

Country/Region china
City & Province shanghai shanghai
Categories AC/DC Adapters
InquireNow

Product Details

Wind Turbine Tower Transition Piece

 

For surface treatment of local corrosion parts, the oxidized corrosion layer and old coating of the corrosion parts shall be completely removed by spraying, and the exposed metal base metal shall reach grade s2.5. The edges of the treated parts shall be polished with power grinding wheel to form a gradient transition layer so as to have a smooth and smooth surface after paint construction. (compared with the traditional manual grinding, the spraying method can completely and thoroughly remove the rust and old coating in the deep layer of the oxidized or even pitted steel plate, and can form good anchor chain type rough lines, which is conducive to forming good bonding force with the primer.)

 After spraying, the primer shall be manually brushed (roller coated) according to the original supporting scheme to reach the specified film thickness. (hand brushing and roller coating can control the position of primer during construction, do not pollute the original coating on the edge, and also effectively control the consumption of primer)

 Brushing or spraying can be used for the construction of intermediate paint to reach the original supporting construction film thickness. The edge area shall be protected and shielded by spraying. The shape of the shield shall be "mouth" shape to form a regular appearance effect (the edge protection of intermediate paint construction can effectively control consumption and ensure the appearance effect)

Topcoat Construction: if the local repair scheme is adopted, the topcoat can be directly sprayed or brushed to meet the original design thickness requirements after the intermediate paint construction meets the thickness standard and meets the requirements of point 3. If the scheme of full construction finish is adopted, the outer surface of the whole tower shall be thoroughly cleaned after the intermediate paint construction reaches the thickness standard. Cleaning method: use 80-100 mesh abrasive cloth to scrub the coated surface, remove the powdered layer, dirt and dirt on the surface of the old coating, and use chemical cleaning to remove the oil stain on the part with oil stain, so that the coated surface can be completely cleaned and then the finish coat can be sprayed.

 
 

Feature

productwind turbine tower
paintingPPG
coloryellow
materialcarbon steel
applicationoffshore
welding testNDT
steel workingwelding and inspected
processrolled
 
Manufacturing process 
 
1, material cutting
 
2. steel plate rolling and welding
 
3. welding
 
4. NDT test
 
5. paint inspection
 
6. testing and inspection instrument
 
7. wind turbine tower transfer and shipment
 
 

 

Hot Products

Pile foundation and transition piece for offshore wind turbine The production process flow of the ...
Wind Turbine Tower Transition Piece For surface treatment of local corrosion parts, the oxidized ...
Wind Turbine Tower Transition Piece applied in offshore wind farm ​ Wind is one of the pollution...
Offshore Wind Power Tower Fabaricated based on requirement Wind is a new energy with great potential...
Steel wire rope pulley wheel for crane 1. Our company can manufacture all kinds of non-standard and ...
Cold formed steel wire rope sheaves 1. Our company can manufacture all kinds of non-standard and ...