Home Companies Shanghai Sunshine Industry Technology Co., Ltd.

Heavy Duty Drum Reclaimers For Coal Reclaiming In Coal Terminal

Shanghai Sunshine Industry Technology Co., Ltd.
Active Member

Contact Us

[China] country

Address: C Building, 888, Huanhu West Second Road, Lingang New Area, China (Shanghai) Free Trade Experimental Zone

Contact name:leo

Inquir Now

Shanghai Sunshine Industry Technology Co., Ltd.

Heavy Duty Drum Reclaimers For Coal Reclaiming In Coal Terminal

Country/Region china
City & Province shanghai shanghai
InquireNow

Product Details

Heavy duty drum reclaimers for coal reclaiming in coal terminal stock

 

 

The drum reclaimers, traveling a horizontal runway, are designed to service parallel storage piles in bi­directional operation in an open stockpiles/yard type storage. The must have 3,500 tons per hour capacity to handle <300 mm sized coal.

The substructures functionally connected to the drum consist of a rail track, electric supply cables, water supply hoses for the sprinkler system, and end bumpers.

The machine is running on running wheels that are mounted on the undercarriage supports. Each undercarriage support has a driving and a running wheel. The drive works with shaft-mounted bevel gear. The driving motors are frequency controlled. The side guide of the undercarriage is realized with a floor railhead, which transmits the lateral forces onto the rails. The undercarriages are equipped with a skew control. The skew is corrected by reducing the speed of the prior running undercarriage. The machine is equipped with a limit switch, which is mounted at the outer end of the lower undercarriage support. The limit switch terminates the moving range of the scraper in both directions. The angle encoder for the path measurement of the scraper is located on the loose running wheel of the lower undercarriage support and detects the position of the machine.

 

Specification of drum reclaimer

descriptionparameterunit
materialCoal, ore, etc 
density0.8~2.3t/m3
granularity<70mm
moisture<2%
reclaiming capacity200~4000t/h
rail span20~50m

 

NOTICES

The customer shall provide the following information when placing order

  • The character of bulk material
  • Stockyard information
  • Process flow chart
  • Power supply
  • Communication and control requirements

 

Photos of our factory

 

Hot Products

Pile foundation and transition piece for offshore wind turbine The production process flow of the ...
Wind Turbine Tower Transition Piece For surface treatment of local corrosion parts, the oxidized ...
Wind Turbine Tower Transition Piece applied in offshore wind farm ​ Wind is one of the pollution...
Offshore Wind Power Tower Fabaricated based on requirement Wind is a new energy with great potential...
Steel wire rope pulley wheel for crane 1. Our company can manufacture all kinds of non-standard and ...
Cold formed steel wire rope sheaves 1. Our company can manufacture all kinds of non-standard and ...