Home Companies GUANGZHOU TECHWAY MACHINERY CORPORATION

Floor Fixed 380V Concrete Placing Boom , 28m Boom Placer Concrete Pump

GUANGZHOU TECHWAY MACHINERY CORPORATION

Contact Us

[China] country

Trade Verify

Address: Room 1311, Building NO.3 Golson Plaza, NO.163 Yingbin Ave,Huadu District, Guangzhou, 510800,China

Contact name:Zhang Chen

Inquir Now

GUANGZHOU TECHWAY MACHINERY CORPORATION

Verified Suppliers
  • Trust
    Seal
  • Verified
    Supplier
  • Credit
    Check
  • Capability
    Assessment

Floor Fixed 380V Concrete Placing Boom , 28m Boom Placer Concrete Pump

Country/Region china
City & Province guangzhou
Categories Pumps
InquireNow

Product Details

Floor Mounted Concrete Placing Boom / FHGY28 Floor fixed placing boom/ Stationary Concrete Placing Boom

 

Features:

1. Boom

The placing boom takes advantage of mature manufacturing platform of boom design of truck-mounted concrete boom. On the base of accuracy data, the boom structure is optimized through finite element analysis, modal analysis, dynamics simulation analysis and endurance test on model machine. The accuracy of design and data is assured through powerful test and industrial assess means. The same-class weld manufacturing technique is adopted for the boom, the quality is excellent.

2. Rotary table and slewing mechanism

The slewing support is a large-sized bearing which connects the boom and the column, and bears the overturning moment produced by the boom. It is a key component that directly affects the whole machine’s safety. The motor redactor is from Brevini in Italy and Dianamic in USA. It is in a high speed rate, and long life span and reliable. The hydraulic motor can rotate the slewing table and the boom 365°through the redactor.

3.Tubular column

The fortified tubular column is adopted. Deformation of the head of the tubular column is 20%~25% less than congener products, it improves the precision for pouring concrete and reduces vibration of the tube.

The connecting structure parts are optimized, and the rigidity of the column is well and the vibration becomes less

4. Climbing device

Two climbing modes are for choice: climbing device on floor and climbing device in elevator well. The climbing structure has been optimized and inclined block auxiliary structure is adopted in the tubular column. All can eliminate the error effectively for drilling holes in the floor.

5. Hydraulic system

The power system adopts electrical engine and plunger pump with high pressure, low flux pulse and low noise. Electro-hydraulic stacked directional valves are from German Bosch Rexroth. They are in good performance and good working condition.

6. Electric control system

The advanced and reliable electricity equipment: Our concrete placing pump has the advanced digital technology control. The electric control box has the flexible outside, excellent manufactory crafts. This equipment runs the high-smart control system reliable, steadily and safely in boom control. It’s all equipped with electric elements from aboard with high reliability. Electric control is comfortable for wired remote control and wireless remote control are all in.

 

 

Specifications:

 

 

Case Show:

 

 

Hot Products

Floor Mounted Concrete Placing Boom / FHGY24 Floor fixed placing boom/ Stationary Concrete Placing ...
Floor Mounted Concrete Placing Boom / FHGY28 Floor fixed placing boom/ Stationary Concrete Placing ...
Floor Mounted Concrete Placing Boom / FHGY32 Floor fixed placing boom/ Stationary Concrete Placing ...
HGY-13 Mobile Placing Boom for Concrete Distribution /Mini placing boom/13 M concrete placing boom...
HGY-17 Mobile Placing Boom for Concrete Distribution /Mini placing boom/17M concrete placing boom...
HGY-24 Elevator fixed Placing Boom for Concrete Distribution /core wall inner climbing hydraulic ...