Home Companies Suzhou orl power engineering co ., ltd

Horizontal Type Boiler Mud Drum Cylindrical Pressure Vessel Water Pipe

Suzhou orl power engineering co ., ltd
Active Member

Contact Us

[China] country

Contact name:Allen Liu

Inquir Now

Suzhou orl power engineering co ., ltd

Horizontal Type Boiler Mud Drum Cylindrical Pressure Vessel Water Pipe

Country/Region china
Categories Boilers
InquireNow

Product Details

Horizontal Type Boiler Mud Drum Cylindrical Pressure Vessel Water Pipe
 
Boiler Mud Drum
 

Boiler Drum,Boiler Waterwall Panel,Boiler Economizer,Boiler Header,Boiler Cyclone Separator,Boiler Chimney Flue Pipe,Boiler Air Preheater,Boiler Air Preheater

A steam drum is used without or in the company of a mud-drum/feed water drum which is located at a lower level. A boiler with both steam drum and mud/water drum is called a bi-drum boiler and a boiler with only a steam drum is called a mono-drum boiler.
 
Boiler Mud Drum Parameter
 
Product Name
Horizontal Type Boiler Mud Drum Cylindrical Pressure Vessel Water Pipe
Applied Area
Natural circulation boiler
Drum Shell Plate Material
Carbon Steel : Q245R, P265GH, SA516-Gr.60/65/70
Alloy Steel : Q345R, Q375R, 15CrMoR, 12Cr1MoVR, P355GH , DIWA353
Drum Head Material
Same as shell
Nozzle Tube Material
As per design
Standard
China GB, ASME, EN
Manufacturer Grade
China A Grade, ABS Certificated, TUV Certificated
Working Temperature
Saturation Temperature at rated pressure
Working Pressure
1.6 MPa ~ 22.5 MPa
Shell Plate Thickness
(Drum Wall Thickness)
≤150 mm
Drum Diameter
≤3,200 mm
Drum Length
≤25,000 mm
Welding
Shell : SMAW, SAW
Nozzle tube : GTAW (TIG), SMAW
Welding NDT
Shell longitudinal seam : 100% RT, 100% UT
Shell circumferential seam : 100% RT, 15% UT
Nozzle tube angle seam : 100% UT, 100% MT

 
 
Boiler Parts
 
Boiler Super Heater,Boiler High Temp Superheater,Boiler Cyclone Separator,Boiler Flue,Boiler Heat Pipe Air Preheater,Boiler Gen Bank,Boiler Heat Pipe Elements,Boiler Tube Pin,Boiler Tubeshield,Boiler Ditch Tube
 
 
Suzhou ORL Power Engineering Co., Ltd.is located in Suzhou, Jiangsu Province.
ORL Power is a leading company and exporter of industrial boilers,power plant boilersand boiler parts (including steam drum, membrane waterwall panel,header,economizer, evaporator, superheater,H-fin economizer, spiral fin tube, air preheater, heat pipe, flue etc.), seamless steel tubes/pipes and ERW steel pipes.ORL provides our customer with full range of services including boiler design, fabrication, installation and commissioning, boiler maintenance, and supervision at site. Our product and service include design and manufacture industrial boilers, pressure vessels and tanks, and pressure parts for power plant boilers (600MW, or 1000MW).
 

 
 
 
Product Description

 
 
Boiler Parts

 

  • Boiler Drum
  • Boiler Waterwall Panel
  • Boiler Economizer
  • Boiler Header
  • Boiler Cyclone Separator
  • Boiler Chimney Flue Pipe
  • Boiler Air Preheater
  • Boiler Air Preheater

 
ORL offers prompt response, professional products, and all-around service to our customers. Our experienced sales team and engineers are waiting for your enquiry and ready to provide sincere service. We cordially welcome domestic and overseas friends to visit our company and manufacturing bases, and look forward to building up long-term, mutual cooperative relationship with you.
 
 
FAQ

 

Q: How long is your delivery time?

A: General small equipment will be ready for shipment in 20-25 days if the materials are in stock, or in 35-40 days if the materials are not in stock.
Large equipment delivery time should be determined after technical discussion. Please contact our sales.

Q: Do you provide samples ? Is it free or extra ?

A: Yes, we could offer the sample tube or sample materials for free charge, but the cost of freight should be paid by Customer.

Q: What is your terms of payment ?

A: General small equipment, the 100% of contract price should be paid after signing. Alibaba third party guarantee is available.
Large equipment payment schedule, please contact our sales.

Q: How long is the warranty period?

A: General small equipment we guarantee 12 months from the date of shipment departure.
Large equipment warranty period is 12 months from the date of commissioning or 18 months from the date of shipment departure which occurs earlier.


 
Contact Information

  • ADD: No.1,Dong Li Road, Dong Lai, Zhangjiagang City, Jiangsu, China
  • Phone:+86 0512-56770166
  • E-mail: orl@orlpower.com
  • Website: www.boiler-units.com 

 

Hot Products

High Pressure Coal Boiler Mud Drum For Industry / Power Station Use Boiler Drum,Boiler Waterwall ...
Customized Color Mud Drum In Boiler / Steel Boiler Spare Part Drum Mud Drum In Boiler Introduction A ...
Horizontal Type Boiler Mud Drum Cylindrical Pressure Vessel Water Pipe Boiler Mud Drum Boiler Drum...
Eco Friendly Boiler Steam Drum , Boiler Components Colored Dryer Drum Boiler Steam Drum Description: ...
power plant gas fired steam boiler boiler parts boiler drum ISO9001 certification Boiler Mud Drum ...
high performance Industry thermal oil boiler boiler parts boiler drum Boiler Parts Boiler Drum...