1. Primary power supply 11, lower plate heating indication 2, fuse tube 12, vulcanization end indication 3, lower plate current indication 13, primary power indication 4, upper plate current indication 14, air leakage automatic switch 5, upper plate control switch 15. Time meter 6, upper plate temperature meter 16, manual/automatic switch 7, lower plate temperature meter 17, vulcanization time switch 8, lower plate control switch 18, lower plate power supply 9, voltage indication 19, upper plate power supply 10, Upper plate heating indication 20, grounding screw
2, dial 6,7 upper finger set the vulcanization temperature (145 °
C) adjustment 15 set vulcanization holding time; 17 placed (OFF)
position; turn on the power, 13 bright. Close the 14 and 10 reading
indications; rotate 5, 8, 10, 11 respectively, respectively, 6, 7
green light is on. Use the test pump to inject water into the water
pressure plate to set the water pressure. When the temperature
reaches the set value, 10, 11 lights off, 6, 7 green light is off,
red light is on, when the 6 and 7 red lights are all on, put 17 in
the "ON" position. (At this point, the temperature is constant
until the end of vulcanization) 15 preset time, the secondary power
supply is automatically disconnected, 12 bright, and the
vulcanization is over. If a meter is damaged during the
vulcanization process, it can be rotated 6 to the manual position,
and all instruments have no effect. The hot plate temperature can
be read from the mercury thermometer, and can be controlled by 5, 8
to maintain the constant temperature, thereby completing the
vulcanization work. In the manual position, the leakage protection
does not work and the total grounding wire must be reliable and
secure.
1. Before use, check the insulation resistance of the hot plate. If it is too low, it should be energized and dried until the insulation value reaches 50MΩ or less.
2, in the use of moving in the process should be handled with care, civilized operation;
3. If you work in the field, you should have reliable rain and waterproof means to avoid being affected by rain and moisture.
4. When the use of its length is completed, it should be placed in the warehouse where the air circulation, relative humidity is not more than 85%, and is not affected by rain. The sleeper is raised below, and it is strictly prohibited to be placed on the ground.