Home Companies Shanghai YIKU Power Equipment Co., Ltd

H150N2 TlT Industrial Fan Parts Bearing Box Fan Spindle Erosion Resistant

Shanghai YIKU Power Equipment Co., Ltd

Contact Us

[China] country

Trade Verify

Address: 5587 Dongchuan Road, Pudong New Area, Shanghai

Contact name:Chen

Inquir Now

Shanghai YIKU Power Equipment Co., Ltd

Verified Suppliers
  • Trust
    Seal
  • Verified
    Supplier
  • Credit
    Check
  • Capability
    Assessment

H150N2 TlT Industrial Fan Parts Bearing Box Fan Spindle Erosion Resistant

Country/Region china
City & Province shanghai shanghai
InquireNow

Product Details

H150N2 Bearing box spindle, fan spindle

 

技术要求
1.材料需作如下试验
(1)同冶炼取试样作化学成份分析
(2)同冶炼炉同连续热处理取2%,但不少于两套试样作机械性能试验(σb,σs,δ,Ψ)
(3)同冶炼炉同连续热处理取2%,但不少于二套试样作冲击试验(αk)
(4)对每一件测定硬度(HB)
2.材料调质后,机械性能
(1)σb=700 N/mm2/
(2)σs=500 N/mm2/
(3)δ5=15 %
(4)Ψ=45 %
(5)αk=58Nm/cm2/
(6)HB=230~260
3.零件需按JB/T1581-85作超声波检验
4.检修时发现:
1) 主轴有裂纹,必须更换.
2) 主轴轴径磨损或拉伤严重,必须要修复.

 

Technical requirement

1. The material shall be tested as follows

(1) Chemical composition analysis of samples taken with smelting

(2) 2% of the same continuous heat treatment with the smelting furnace, but not less than two sets of samples for mechanical properties tests (σb,σs,δ,Ψ)

(3) Take 2% of the same continuous heat treatment with the smelting furnace, but not less than two sets of samples for impact test (αk)

(4) Determine the hardness of each piece (HB)

2. Material after tempering, mechanical properties

(1)σb=700 N/mm2/

(2)σs=500 N/mm2/

(3)δ5= 15%

(4)Ψ= 45%

(5) alpha k = 58 nm/cm2

(6)HB=230~260

3. Parts shall be ultrasonic inspected according to JB/T1581-85

4. Found during maintenance:

1) The spindle has cracks and must be replaced.

2) The main shaft diameter is seriously worn or pulled and must be repaired.

Hot Products

H200N2 Bearing housing shell 1.金加工后进行密封试验.试验压力为3×105/Pa.试验时间为15分钟,要求轴承箱体本体不渗漏 2.用五倍放大镜检查铸件加工表面,不允许有气...
H150N2 Bearing housing shell 1.金加工后进行密封试验,试验压力为3kg/cm,试验时间为15分钟,要求轴承箱本身不渗漏. 2.用5倍放大镜检查加工表面,不允许有气孔. 3...
H180N1 Bearing housing shell 1.金加工后进行密封试验,试验压力为29.43Pa,试验时间为15分钟,要求轴承箱本身不渗漏. 2.用5倍放大镜检查铸件加工表面,不允许有气孔...
H150N2 Bearing box spindle, fan spindle 技术要求 1.材料需作如下试验 (1)同冶炼取试样作化学成份分析 (2)同冶炼炉同连续热处理取2%,但不少于两套试样作机...
H180N2 Bearing box spindle, fan spindle 技术要求 1.材料需作如下试验 (1)同冶炼取试样作化学成份分析 (2)同冶炼炉同连续热处理取2%,但不少于两套试样作机...
H200N2 Bearing box spindle, fan spindle 技术要求 1.材料需作如下试验 (1)同冶炼取试样作化学成份分析 (2)同冶炼炉同连续热处理取2%,但不少于两套试样作机...