Home Companies Guangzhou Kinte Electric Industrial Co., LTD

Back wall assembly automatic welding workstation

Guangzhou Kinte Electric Industrial Co., LTD

Contact Us

[China] country

Trade Verify

Address: No.16 Yufeng Road Shiling Town Huadu District Guangzhou, China

Contact name:Alex

Inquir Now

Guangzhou Kinte Electric Industrial Co., LTD

Verified Suppliers
  • Trust
    Seal
  • Verified
    Supplier
  • Credit
    Check
  • Capability
    Assessment

Back wall assembly automatic welding workstation

Country/Region china
City & Province guangzhou
Categories Other Welding Equipment
InquireNow

Product Details

Back wall assembly automatic welding workstation

 

 

The Intelligent Equipment Division is committed to providing industrial enterprises with advanced intelligent manufacturing equipment and system integration solutions, providing products and services covering the entire project life cycle from R&D, design, manufacturing, project management, and technical services. The existing working team of the business department has many years of experience in flexible welding production lines of industrial enterprises, digital factory solutions, intelligent conveying equipment, and factory automation systems.

 

 

 

The practice of digital factory - "virtual commissioning"

 

"Virtual commissioning" technology refers to the realization of process planning, product data, manufacturing simulation and production line layout evaluation of the entire production line and production process in a virtual environment, and at the same time, the logistics module is used to analyze and optimize the logistics of the entire production line.

 

Its advantage lies in the combination of simulation and control technology, which compresses and advances the manufacturing process in the virtual environment, and can be evaluated and inspected, and the mechanical design work is verified and optimized before the equipment is materialized, reducing the risk of design errors .

 

At the same time, it can realize the advanced debugging of the complete automation control logic, and complete the offline debugging of the robot and electrical system before the equipment manufacturing is completed. This technology greatly shortens the follow-up on-site debugging time, and improves the competitiveness of the transformation project and the reliability of project implementation.

Hot Products

311 welding line project 1. Project name S311 welding line project 2. Project time January 2018 3. ...
ZB20003-Wuhu Plant Welding Line 21 Production Capacity Improvement 30JPH Engine Room and Side Wall ...
Welding line Project introduction: Light truck cab assembly automatic welding line. The four models ...
Automatic welding workstation for rear floor assembly The Intelligent Equipment Division is ...
Back wall assembly automatic welding workstation The Intelligent Equipment Division is committed to ...
Arc welding workstation system integration Kinte has fully mastered the arc tracking and laser seam ...