Home Companies Guangzhou Kinte Electric Industrial Co., LTD

Cylinder Head Assembly Line/Automotive Assembly Line

Guangzhou Kinte Electric Industrial Co., LTD

Contact Us

[China] country

Trade Verify

Address: No.16 Yufeng Road Shiling Town Huadu District Guangzhou, China

Contact name:Alex

Inquir Now

Guangzhou Kinte Electric Industrial Co., LTD

Verified Suppliers
  • Trust
    Seal
  • Verified
    Supplier
  • Credit
    Check
  • Capability
    Assessment

Cylinder Head Assembly Line/Automotive Assembly Line

Country/Region china
City & Province guangzhou
InquireNow

Product Details

Cylinder head assembly line

 

Provides an intelligent interface for the operator's easy operating system, ensuring the realization of "human-machine integration".

The operation of each station is unique (the assembly line can ensure that the operator will not make any mistakes during assembly), the production line is automated, intelligent, and digital, and the quality defects can be found in time during the assembly process, and the quality of the engine is stable. And predictable, and finally provide customers with nearly zero-defect products.

 

4 Calculation and determination of technical parameters of automobile assembly line

 

In the design of the process floor plan of the general assembly workshop, the following design principles must be followed to ensure the standardized production of automobiles. One is to design in combination with the shifts specified in the production schedule in the program of car production in the workshop, and plan the production process according to the arrangement of the production shifts. The second is to pay attention to the matching of personnel and assembly machinery on the assembly line. According to the difficulty and quantity of mechanical construction on the production line, the number of workers is arranged according to the corresponding workload, and the responsibility system is divided to improve work quality and work efficiency. The third is to calculate the number of allocated parking spaces. During the calculation process, operators and designers are avoided to make subjective assumptions, and the station density is determined according to the length of the car sound and the comfort of people. Finally, it is necessary to determine the effective distance of the station density. This is mainly because the vehicle operator must design an effective distance between the two car bodies to avoid the interference of the front-end and rear-end operations during the operation. distance. The selection of car body length is based on the maximum outer contour length of the car. And when the operator works at the front end and the rear end of the two car bodies at the same time, the two sides do not interfere with each other, and this distance can be taken as the distance between the two car bodies. All in all, in the process of designing the process floor plan of the general assembly workshop, the relevant data should be expressed in strict accordance with the relevant specifications, and the layout should be strictly in accordance with the drawings, so as to ensure the smooth progress of automobile production and manufacturing.

Hot Products

Plate Conveyor Plate conveyor adopts steel-type/plastic-type plate conveyor, mainly composed by ...
Power battery assembly line The battery automatic group assembly technology involves the research on ...
Chassis Assembly Line Chassis frictional conveying system is characterized by high-automation, easy...
Gearbox assembly line Provides an intelligent interface for the operator's easy operating system, ...
Cylinder head assembly line Provides an intelligent interface for the operator's easy operating ...
High-Speed Roller Conveyor and Skid Conveyor System High-speed roller Conveyors and Skid Conveyor ...