Home Companies Jiangsu Sankon Building Materials Technology Co., Ltd.

12 Tons Semi Finished AAC Block Cutter Sling

Jiangsu Sankon Building Materials Technology Co., Ltd.
Active Member

Contact Us

[China] country

Address: No.31 Xinxi Road, Chunjiang Town, Changzhou City, Jiangsu Province, China.

Contact name:Rita

Inquir Now

Jiangsu Sankon Building Materials Technology Co., Ltd.

12 Tons Semi Finished AAC Block Cutter Sling

Country/Region china
City & Province changzhou jiangsu
InquireNow

Product Details

Semi-finished sling for AAC production line
 
Application:
It is used to move the billet and the side panel to the turning table for de-skin.
 

Description:

The sling (see the picture) is a match equipment for autoclaved aerated concrete cutting machine. It is installed on the automatic billet shift machine, the lifting is controlled by the guide frame. It is a special tool to move the de-skin billet to the autoclave.

Structure:
The sling is composed of a horizon beam, a vertical beam, a guide frame and a lifting unit.
The two beams are made of huge steel pipes, so it is featured of good stiffness, compact structure and it can be easily installed and debug.
Lifting device is located on the horizon beam and the guide unit is fixed on the vertical beam.
 
Technical parameter:

Size(Maximum):
Length9458mm
Width3030mm
Height937mm
Weight5230kg
Loading capacity12tons
ReducerFA77-35.25-YEJ4-H1-0°
Motor ModelYEJ132S-4
PowerN=4KWX2
Rotate speedn=1440r/min
Moving speed~40.9m/min
Cylinder
Diameter100
Stroke1500

 
Working principle:
When the over-head hanger rope is lifted by the pulley wheel lifts, the guide unit will move along the frame and then the sling will go up and down.
 
Assembly:
Following procedure should be performed
1. To combine the horizon beam and upright beam t together.
2. To connect the guide frame to the automatic billet shift machine.
3. To combine guide device and its frame together.
4. To assemble the lifting device and guide frame together.
 
Maintenance and repair:
1. Maintenance
a.Please remove the dust on the piston rod after work with cotton cloths and make sure it is reset.
b.To clean up the lifting device, guide unit without any waste left.
2. Repair
Please check all fasteners to avoid any possible loose and change worn parts.



























Hot Products

Overturn crane/sling Description: The Overturn crane can adapt to the requirements of different ...
Semi-finished sling for AAC production line Application: It is used to move the billet and the side ...
Side Rolling guide for AAC Block Making Structure: The convey line is composed by many rolling guide...
Automatic mould oiling machine Description: It has automatic identification module box in place, ...
Side plate cleaning machine Description: Side plate cleaning machine install above on the side plate ...
SANKON Building Materials Technology Co. is a one stop solutions provider for autoclaved aerated ...