Results for8 8 mechanized bridgefrom 2618 Products.
|
Erection Time 75min Axle Load Lt-20 Simple Structure Mechanized Bridge Description: Erection Time 75min Axle Load Lt-20 Simple Structure Mechanized Bridge is used to fast erect a ...
|
|
|
|
21m Mechanical Bridge Ensure All Sorts Of Vehicles Go Across Rapidly 21m Mechanical Bridge Ensure All Sorts Of Vehicles Go Across Rapidly is sort of emergency equipment carried by ...
|
|
|
|
Folded Outline Dimension (L*W*H) 10890*3150*3660 Mm Modular Fast Erection Heavy Mechanized Bridge China Harzone dedicates itself to the following fields: Design and manufacturing ...
|
|
|
|
30000kg Load Bridge Weigh In Motion System Rapid Detection Product Description Bridge Weigh In Motion is mainly composed of three main components: the load-bearing force transmissi...
china
|
|
|
|
WMST Mechanical Setting Tool For WSV/WSVB bridge plug / Cement Packer The WMST mechanical setting tool sets and operates WSV/WSVB bridge plug or cement packer. This setting tool is ...
china
|
|
|
|
3L Retrievable Bridge Plug Packer Type RBP For Drill Stem Testing The 3L Retrievable Bridge Plug is the packer type bridge plug, the RBP consists of packer-type sealing elements, ...
china
|
|
|
|
Well Testing Retrievable Bridge Plug 5 1/2" x 10000 psi WP RBP 3L Retrievable Bridge Plug(RBP) is a high-pressure packer style bridge plug used for multiple selective zone treating ...
china
|
|
|
|
SVB Squeeze Packers For Cementing Operation / Drillable Bridge Plug SVB is the Squeeze Packer used in remedial cementing operations, also the SVB can be used as the drillable ...
china
|
|
|
|
Mechanical sludge scrapper for circular clarifier in water treatment plant Product introductions TPZXG Centre Driven Clarifier Scrapper, the load of the whole scrapper acts on the ...
|
|
|
|
Biomass steam boiler steam generator bridge maintenance Our biomass steam generator comes from a wide range of sources, and is produced by mechanical processing of wood chips, ...
|
|
|
|
SVB Squeeze Packers For Cementing Operation / Drillable Bridge Plug Squeeze Packer is the kind of high-temperature/high-pressure sliding-valve cement retainers which is used for ...
china
|
|
|
|
Product Parameters Products: H beam Grade: Q235,SS400,ASTM A36,s235JR , S335JR Standard: JIS,GB,EN ,ASTM,DIN,AISI,BS Length: 6-12m Flange Thickness: 8mm-64mm Flange width: 50-400mm ...
|
|
|
|
XDEM ZJ-150 Portable Water Well Drill Rigs Self-propelled Vechicle Tractor Mounted Water Well Drill Rigs Drilling machine mainly consist of diesel engine, friction clutch, gearbox, ...
|
|
|
|
ASTM 321 Cold Rolled Stainless Steel Plate 1.0mm 1.2mm Thickness 321 stainless steel is a material with excellent high temperature stress breaking performance and high temperature ...
|
|
|
|
What is anchorage? Anchorage is a permanent anchoring mechanism used in prestressed concrete that is critical in applying the shrinkage force generated by the prestressed tendons ...
|
|
|
|
1.Pusher description The PC wire drawing machine adopts mechanical drive, and the roller clamps the steel wire for transmission. PC wire drawing machine can move forward, backward, ...
|
|
|
|
Temporary Bridge Of 17-51m Temporary Bridge Mechanized Bridge Description of Temporary Bridge Of 17-51m Temporary Bridge Mechanized Bridge: Temporary Bridge Of 17-51m Temporary ...
|
|
|
|
Erect A 51m Bridge Temporary Bridge Mechanized Bridge Description of Erect A 51m Bridge Temporary Bridge Mechanized Bridge: Erect A 51m Bridge Temporary Bridge Mechanized Bridge ...
|
|
|
|
Erection Time (Complete Bridge) 90 Min Mechanized Bridge Fast Bridge Description of Erection Time (Complete Bridge) 90 Min Mechanized Bridge Fast Bridge: Erection Time (Complete ...
|
|
|
|
Allowed Bank Differences 2m Mechanized Bridge Emergency Bridge Introduction of Allowed Bank Differences 2m Mechanized Bridge Emergency Bridge Allowed Bank Differences 2m Mechanized ...
|
|
|
You may also be interested in :