Home Companies WUXI RONNIEWELL MACHINERY EQUIPMENT CO.,LTD

Bullet Tank Assembly Roller Bed 400t Fixed Hydraulic Fit Up Rotator Vessel Growing Line

WUXI RONNIEWELL MACHINERY EQUIPMENT CO.,LTD

Contact Us

[China] country

Trade Verify

Address: No.28,Xieda Road, Yangshan town, Huishan disttict, Wuxi city

Contact name:LUO WEN HUI

Inquir Now

WUXI RONNIEWELL MACHINERY EQUIPMENT CO.,LTD

Verified Suppliers
  • Trust
    Seal
  • Verified
    Supplier
  • Credit
    Check
  • Capability
    Assessment

Bullet Tank Assembly Roller Bed 400t Fixed Hydraulic Fit Up Rotator Vessel Growing Line

Country/Region china
City & Province wuxi jiangsu
InquireNow

Product Details

Bullet Tank Assembly Roller Bed 400t Fixed Hydraulic Fit Up Rotator Vessel Growing Line

 

 

Brief introduction: 

  • Work load limit 400t/pair(2 idler) assembly roller bed using for heavy duty bullet tank/vessel sections fitup growing production line;
  • Working with 800t welding rotator & welding column boom/gantry welding platform with welding method of single/tandem-twin SAW; 

 

Product description:

  • The 400t fixed assembly roller bed is composed by pair of hydraulic liftable idler rotators, oil pump station,wireless pendant controller etc. 
     
  • Hydraulic liftable idler rotator is including pair of hydrualic liftable wheels, pedestal with reserved bolt screws and so on. 
     
  • The pedestal of the assembly roller bed is with reserved bolt screws . By changing the wheel seat interval distance, it could be using for diverse diameter sections assembling procedure. 
     
  • Oil cylinders of the roller beds are independently controlled via wireless remote controller. 

 

 

Main Technical Parameters

 

ModelHGKZ-400
Work load limit (ton)400
Wind tower section dia. Range (mm)1800~9000
Dia.& width of wheel (mm)900x450mm
Adjustable modeTwo hydraulic cylinder independent adjustment
Roller speed (m/min)Idler without power

 

 

 

Feature:

  • Forged steel wheel special made for heavy duty cylindrical body.
     
  • Top class electric works, comply with CE crieteria.
     
  • Rotator base & boring is integrated process,so as to guarantee the roller rotating precision
     
  • Fixed pedestal staionary on the floor. There is hoist fixture on the roller bed facilitate the displacement of the equipment. 
     
  • Working with welding rotators to composed as growing production line, using for distillation column/spud pole/wind tower sections assembling/growing procedure. 

 

Competitive Advantage:

  • Inverter and Main electric elements are Siemens/Schneider or equal brand.
     
  • VFD rotary speed control, improving the reliability of operation.
     
  • Steel wheel which can ensure a long time using .
     
  • With lubrication system.
     
  • Accept testing before delivery.
     
  • Accept special design and custom.

 

 

8x8 Column Boom Manipulator Welding For Vessel Tower 0

 

8x8 Column Boom Manipulator Welding For Vessel Tower 1

 

8x8 Column Boom Manipulator Welding For Vessel Tower 3

8x8 Column Boom Manipulator Welding For Vessel Tower 4

 

Seam Tracker Central Operate Tank Tower SAW Welding Manipulator 4

What Ronniewell can do for Ronniewell customers:
 

  • Give you high quality products.
  • Give you five-star price.
  • Give you suitable recommendation.
  • Give you good after-service.
  • Give you professional technical guide.
  • Warmly welcome you visit our factory.


Points you may concern:
Customization - Can your machine or other products be customized?
Ronniewell: Sure. As a professional manufacturer, we have our own engineer team, who is good at design, develop & build special solution catering for your individual requirement.


Transportation-What about the transportation?
Ronniewell: Seaway is the most common transportation way for oversea trading. Depends on your location, combined transport by rail and sea is also an option. Certainly railway transportation is also acceptable if it is the most suitable approach.


After sale service - What about the after-sale service?
Ronniewell: We provide 12month guaranty period for the whole machine quality. During this time, any issue proved because of the machine flaw itself,we would take the whole responsibility of it. Except of the guaranty period,technical advisory support is available freely covering the whole using life of the machine. Engineer service on user premises is also available for necessary.

 


 

Video link

 

https://www.youtube.com/c/RonniewellAutomatedWeldingSolutionProvider

 

 

 

Welcome to follow us on following social media:

 

Facebook: https://www.facebook.com/weldingrotatorcn

 

 

LinkedIn: https://www.linkedin.com/in/automatedwelding

 

 

Name of the machine:
welding rotator, pipe welding rotator, pipe turning rolls, welding turning rolls, welding roller, tank turning rolls, pipe turning rolls, tube turning rolls, fit up rotator, self-aligned welding rotator, self-aligning welding rotator, self adjustable welding rotator, self aligned roller stand, wheel frame, roller frame for wind tower welding, automatic adjustable welding pipe rotator, conventional welding rotator, bolt adjustable welding rotator, sand blasting rotator, painting rotator, 1+1 hydraulic fit up rotator, two in one fit up station

Hot Products

Bullet Tank Assembly Roller Bed 400t Fixed Hydraulic Fit Up Rotator Vessel Growing Line Brief ...
700T Fit-up Roller Bed 10m Offshore Suction Bucket Assembly Station Automatic Weld Line Brief ...
Traversing 150T Tank Welding Roller Bed Tube Conventional Turning Rotator With Rail Cars Brief ...
150T Tank Welding Roller Bed Tube Conventional Welding Rotator With Motorized Rail Cars Description: ...
XL Monopile 2000t Assembling Rotator Offshore Foundation Fit Up Welding Production Line Brief ...
1000T Hydraulic Jacking Fit Up Rotator For Monopile Windtower Offershore Windmill The turning roll ...