Home Companies Shandong Shante Heavy Industry Machinery Co., Ltd.

Coal Mine Loader

Shandong Shante Heavy Industry Machinery Co., Ltd.

Contact Us

[China] country

Trade Verify

Address: South Park North Road , Yuncheng County , Heze City , Shandong , China

Contact name:Icy Guo

Inquir Now

Shandong Shante Heavy Industry Machinery Co., Ltd.

Verified Suppliers
  • Trust
    Seal
  • Verified
    Supplier
  • Credit
    Check
  • Capability
    Assessment

Coal Mine Loader

Country/Region china
City & Province heze shandong
InquireNow

Product Details

Coal Mine Loader

Service environment of crawler loader

a). The section is a laneway of above 2.0×2.0 m.

b). The Platts hadrness of rocks (f) is less than 12, the lumpiness is less than and equal to 400mm; the loose density is not more than 1.8t/m3.

c). Altitude≤1000m; special design is necessary for plataeu environment with an altitude of more than 1000m.

d). Laneway environment is -5℃~+40℃; the max relative humidity ≤90% (when the temperature is 25℃).

e). The limit deviation of voltage is ±5%; the limit deviation of AC frequency is ±1%.

f). The laneway gradient ≤10°; special design needs to be conducted or necessary measures need to be adopted when working in the tunnel with a laneway gradient of more than 10°.

g). When the loader works, the surrounding coal-dust and methane explosive gas content shall conform to the safety content set forth by coal safety procedures.Coal Mine Loader


Products Advantage:

Compact structure

Easy to operate and maintain

Stable and durable performance

High efficiency and saving man power

Energy conservation and environment protection

Dumping height and loading distance can be customize according to your working condition.

If your mine is big slope,we can customize right machine for you,the biggest working tunnel slope is 30 degree.

Our products are safe and stable with explosion-proof electric motor for coal mine.

The machine is driven by electric and hydraulic power,walking by hydraulic.Coal Mine Loader


FAQ:

Q: What is the delivery time ?
A: Normally the leadtime is 10 days after receipt of 30% deposit.

Q: What is the Payment terms ?
A: TT OR LC.

Hot Products

Haggloader with Breaking Hammer Product Description -The Haggloader with Breaking Hammer is composed ...
Gold Mining Loader This machine integrates hoeing and conveyance, characterized by compact structure...
Underground Mining Haggloader Optima mucking loader We help you select the ideal mucking loader for ...
Coal Mine Loader Service environment of crawler loader a). The section is a laneway of above 2.0×2.0 ...
The crawler propels to shovel rocks and digs up rocks into its own belt conveyor with a bucket, and ...
Underground Mine Loader Model STB-180D is applied for big slope 30 degree working tunnel. It is used ...