Home Companies Wuhan Huaying Electric Power Tech & Science Co.,ltd

Primary Current Injection Test Set

Wuhan Huaying Electric Power Tech & Science Co.,ltd
Active Member

Contact Us

[China] country

Address: No2, Floor 4,Building 7,Guannan Fuxing Pharmaceutical Industrial Park,No.62,Optical Valley Road, East-Lake New Technology Development Zone, Wuhan City, Hubei ,PRC

Contact name:Ms. Amy Wang

Inquir Now

Wuhan Huaying Electric Power Tech & Science Co.,ltd

Primary Current Injection Test Set

Country/Region china
City & Province wuhan hubei
Categories Other Electric Power Tools
InquireNow

Product Details

HYPCIT Primary Current Injection Tester (Integrated Model)

 

Introduction

 

HYPCIT series primary current injection tester is applied in power system for circuit breaker test, protection system test and current transformer test. The current injection tester generates a high current from power supply to simulate the rated current or fault current in the primary circuit of power equipment. The 1000A/15KVA HYPCIT primary injection test set is designed in Integrated model.

 

HYPCIT Primary current injection tester Functions and Applications

 

1) High current output injected to the main circuit of power line to simulate the fault current. And then check whether the    protection system will be operated according to the design

2) High current output injected to the primary of current transformer and then measure the inducted current from secondary by error measurement instrument to check the ratio error and phase displacement of CT

3) High current output injected to the main circuit of circuit breaker to simulate the rated current in primary. And then check the stability of circuit breaker according to the temperature rise procedure.

4) Considered as a AC high current source in power equipment or cable test

 

Technique Index

 

1 Power supply: AC220V or AC 400V, 45Hz~65Hz. 

2 Typical output current: 500A or 1000A or 2000A

   Typical output capacity 3KVA or 5KVA or10KVA or15KVA

   It can be customized according to your requirements from above specs

3 Impendence voltage: 8%

4 Idle current: 6%

5 Current distortion <5%

6 Current is measured from the secondary of current transformer

    which is installed in the internal of the current booster.

   The display unit is 4 and 1/2 digitals current meter. Maximum measurement error 0.5%RDG+5D.

7 Timer indication of test running is an optional configuration.

   The timer could be customized according to the requirement of customer from the follow list:

    1)4 digital timer from 0~9999s / 0~999.9s /0~99.99s, accuracy 0.5%RDG+5D

    2)5 digital timer from 0~99999s / 0~9999.9s /0~999.99s, accuracy 0.2%RDG+2D

    3)6 digital timer from 0~999999s / 0~99999.9s /0~9999.99s, accuracy 0.1%RDG+1D

8 work temperature:0~40 C, Humidity <90%

 

Model

Output Current(A)

 

Capacity

(KVA)

Output Voltage(V)

5/500

500

5 

10

5/1000

1000

5

 

5

10/1000

1000

10

 

10

5/2000

2000

5

 

2.5

10/2000

2000

10

 

5

 
 

Hot Products

Transformer Ratio Meter HYBC-901 1 The voltage ratio measurement for three or singe phase transforme...
Transformer Ratio Meter HYBC-Z HYBC-Z TRANSFORMER TURNS RATIO TESTER is specially designed for three...
Transformer Load and No-load tester HYKF 1. Measure the transformer load current, load loss, short...
Transformer Sweep Frequency Response Analyzer HYRZ-902 1,Using the advanced technical of DDS; 2...
HYPCIT Primary Current Injection Tester (Integrated Model) Introduction HYPCIT series primary ...