Home Companies Jiangsu Lebron Machinery Technology Co., Ltd.

Fully Automatic Door Frame Roll Forming Machine High Production Capacity

Jiangsu Lebron Machinery Technology Co., Ltd.
Active Member

Contact Us

[China] country

Address: 1604#, Yangming Sicence & Technology Industry Center, No.855 Nanhu Avenue,Wuxi city, Jiangsu, China

Contact name:Alfred

Inquir Now

Jiangsu Lebron Machinery Technology Co., Ltd.

Fully Automatic Door Frame Roll Forming Machine High Production Capacity

Country/Region china
City & Province wuxi jiangsu
InquireNow

Product Details

High Quality Fully Automatic Door Frame Roll Forming Machine High Production Capacity

 

 

1. Description of Door Frame Roll Forming Machine

 

The Door Frame Forming Machine is a roll forming machine used in the steel plate cold forming industry. It can continuously shape the steel plate through an automatic press according to the customer's requirements and cut flies to a certain length.

 

This Door Frame Roll Forming machine can produce various kinds of Roll Formed Aluminum & GI Steel Door or Window frames.

 

The punching also can be designed according to your needs. the door frame surface will be very smooth and beautiful without any scratches on the surface.

 

Lebron-Machinery is manufacturing high-quality door frame machines, and they are mostly exported to foreign countries, such as India, Angola, Ethiopia, Ghana, Zambia, Brazil, Argentina, Thailand, Philippines, Pakistan, Russia, etc.

 

 

2. Technical Parameters of Door Frame Roll Forming Machine

 

Suitable materialGalvanized steel strip
Main motor power7.5KW with Cycloidal reducer
Hydraulic station power4KW
Hydraulic oil36#
Thickness of material0.8-1.5mm
Diameter of the principal axisΦ70mm
Material expands width200mm-420mm
Electric tension380V 3phase 60HZ
Material of rollerGCr15 bearing steel HR58-60
Rolling galvanization thickness0.05mm
Processing speed15-20m/min
Processing precision within10m+/-1.00mm
Material of cutting bladeCr12 mold steel with quenched treatment
Kind of drive1.5-inch chain link bearing model 6210
Roller station18 Rollers
Dimension8.5m*0.9m*1.3m
Weight5.5Ton
Screen5.7-inch Taida screen
PLC brandMitsubishi

 

 

3. Main components of Door Frame Roll Forming Machine

 

Name

Quantity

Uncoiler

1set

Coil sheet guiding device

1set

Main roll forming system

1set

Punching device

1set

Cutting device

1set

Hydraulic station

1set

PLC control system

1set

Support table

1set

 

 

4. Our Service

 

After the machine arrives at the destination, the seller will send the technician to the buyer’s factory to install the machine if the buyer wants. The buyer needs to provide some technicians to assist in the installation work.

 

The installation period is around 5 days. The buyer should have been prepared for the steel sheet, and foundation position of the machine before the seller’s technician's departure.

 

The buyer should arrange the accommodation, food, and traffic in the destination

 

Training period: 2 days. (we can supply training on the operation spot if the buyer needs)

 

Within 3 months after the arrival of the goods at the port of destination, if there is no installment requirement from the Buyers, the goods should be counted as up to standard. The inspection standard is based on the technical standard signed by both parties and our company standard.

 

 

5. FAQ

 

1. Q: How to visit our company:

A: 1). Fly to Wuxi Airport directly;

2). By fast train From Shanghai Hongqiao station to Wuxi station, then we can pick up you at our factory.

 

2. Q: What should I provide if I want to customize the machine?

A: You need to provide the profile drawing, material, thickness, voltage, and your special requirements. Then, our technology team will analyze and offer you a suitable technical proposal.

 

3. Q: What is the Warranty?

A: 12 months

 

4. Q: What can you do if the machine is broken?

A: Our machine's warranty period is 12 months, if the broken parts can't repair, we will send new free parts to replace the broken parts. You need to pay the cost of the machine that exceeds the warranty period. we can negotiate to solve the problem, and we supply technical support for the whole life of the equipment.

 

5. Q: If need a technician to the workshop to debug and teach, how to do it?

A: We can send technicians to your country to install the machine. The buyer should bear the expenses including visa, round trip ticket, and suitable accommodation, also the buyer should pay a salary of 100 USD/day.

 

 

 

 

 

 

Hot Products

Stable Running Fully Automatic Door Frame Roll Forming Machine High Efficiency 1. Description of ...
Fully Automatic Door Frame Roll Forming Machine High Efficiency Long Service Time 1. Description of ...
Durable And Stable Fully Automatic Door Frame Roll Forming Machine Long Service Time 1. Description ...
Durable High Efficiency Fully Automatic Door Frame Roll Forming Machine High Quality 1. Description ...
High Quality Fully Automatic Door Frame Roll Forming Machine High Production Capacity 1. Description ...
Long Time Service Time High Quality Fully Automatic Door Frame Roll Forming Machine 1. Description ...