Home Companies Cangzhou Best Machinery Co., Ltd

High Speed Main Channel U Profile Roll Forming Machine Villa House Frame

Cangzhou Best Machinery Co., Ltd

Contact Us

[China] country

Trade Verify

Address: Room 1002 A Building XuHong Mansion NO.3 Beijing Road Cangzhou City Hebei Province China

Contact name:Arno Hao

Inquir Now

Cangzhou Best Machinery Co., Ltd

Verified Suppliers
  • Trust
    Seal
  • Verified
    Supplier
  • Credit
    Check
  • Capability
    Assessment

High Speed Main Channel U Profile Roll Forming Machine Villa House Frame

Country/Region china
City & Province cangzhou hebei
Categories Plastic Product Making Machinery Parts
InquireNow

Product Details

High Speed Main Channel U Profile Roll Forming Machine Villa House Frame

Sepcifications for CNC Light Keel Main matel frame stud Channel roll former Forming Machine
 
Manual Un-coiler
Max Capacity: 5000kgs
Inner diameter of coil:450-550mm
Manual with brake
 
Leveling Device
Ensure the material level and straight
The width can be adjusted
 
 
 
 
 
 
 
 
 
Main Forming System
Width & Height & Thickness of sheet: According to Drawings
Material: GI sheet coil or Colored sheet coil
Motor Power: 5.5 kw forming system
Roller material:Cr12.
Surface of Roller: Heat treatment HRC58-60.
Diameter of main shaft: 60mm #45 steel, heat treat modulation
Forming station: 12 stations.
Transmission: by chain and gear
Measuring accuracy: +/- 0.5 mm/M.
Safety Hood: Cage
Arch middle plate: 30mm thickness.
Output: 8-10 Tons per shift (8 hrs.).
The machine base is assembled and welded by high quality steel.
 
 
 
 
Hydraulic Cutting Device
Cutting way: Tracking (Flying)..
Oil pump station: 1set
Motor power of Oil pump station: 7.5kw with cooling system.
Forced air cooling device available.
Cutting mould: 1 sets.
Material of blade: CR12 with heat treatment HRC60-62.
Electrical System
Control system: HMI & PLC control panel.
Power: 440V 50Hz (as per local requirement)
Run-out Table
Frame: 8# steel groove welded
Roller type.
Quantity: 1 pc

 


RFQ

Step 1: Tell us your requirements
Step 2: Quoataion will be sent based on your requirement. Solution will be recommended to you as the alternative
Step 3: Negotiate and confrim each details for goods, trading terms and so on, get agreement and sign contract.
Step 4: Advanced payment and production
Step 5: Factory Examine Goods/ rectify and reform to meet the requirements of contract.
Step 6: Balance payment and shipping
Step 7: Handing Shipping files to help clients get goods from transporter in time.
Step 8: Clients get goods and go into warranty time.

 

1. Installation and training:
a.If buyers visit our factory and check the machine, we will teach you how to install and use the machine, and also tr

ain your workers/technician face to face.
b.Without visiting, we will send you user manual and video to teach you to install and operate.
C.If buyer needs our technician to go to your local factory, please arrange board and lodging and other necessary th

ings.

2. After Service

a.One year guarantee for whole machine.

b.24 hours technical support by email or calling

c.If there is any problem found of the machine, we will repair it for free in one year.

 

 

 

 

 

 


 

Hot Products

Stud And Track Roll Forming Machine HIgh Speed Steel GI Omega Furring Channel Machine components De...
Ceiling Drywall Steel Stud And Track Roll Forming Machine U Channel Machine components De-coiler----...
3 in 1 Angle Stud And Track Roll Forming Machine Main Channel And Furring Channel Machine components ...
Light Steel Keel Guage C U Channel Roll Forming Machine Ceiling Panel Light keel forming machine has ...
High Speed Main Channel U Profile Roll Forming Machine Villa House Frame Sepcifications for CNC ...
Flying Saw Furring Channel Roll Forming Machine Gypsum Board 2 Year Warranty Machine components: De...