Home Companies String One Technology Co.,Ltd.

High Flexibility Security Posts And Bollards Simple Designs Suit Any Architectural Building

String One Technology Co.,Ltd.
Active Member

Contact Us

[China] country

Address: Lilang Zhongsheng Technology Park, Nanwan Street, Longgang District, Shenzhen, Guangdong, China

Contact name:Aaron Zhang

Inquir Now

String One Technology Co.,Ltd.

High Flexibility Security Posts And Bollards Simple Designs Suit Any Architectural Building

Country/Region china
City & Province shenzhen guangdong
InquireNow

Product Details

Custom Stainless Steel Bollards Warning Column Pole And Stake Pile For Road

 

About Custom Stainless Steel Bollards Warning Column Pole And Stake Pile

  • Road piles (Bollard and pole)are a common name for cylindrical roadblocks. It is often made of rubber, PVC, PE by blow molding, steel pipe and injection molding. It has good warning, flexibility and anti-car rolling. It is mainly used for urban intersection driveway, highway maintenance, traffic police enforcement, road administration, hotel, community. Airports, banks, schools, business centers, stadiums, dangerous areas, road construction sites, etc.

There are many types of road piles(Bollard and pole). There are four types: fixed, fixed and movable, fixed and pre-buried, semi-automatic lifting, fully automatic.

 

Stainless Steel Bollards Warning Column Pole And Stake Pile Classification

  • The road piles (Bollard and pole)are divided into diameters: they can be divided into six diameters: 120mm, 160mm, 168mm, 194mm, 219mm, and 275mm.
  • The wall thickness ranges from 1mm to 15mm, and the height above the ground of the pile is from 400-700mm.
  • After the fixed road pile is fixed with the expansion screw, all the motor vehicles can't pass this; after the active road pile is installed, the top can be opened with the key to facilitate the entry and exit of the motor vehicle.
  • The fully automatic lifting column is currently the most intelligent and most commonly used one.
  • The automatic lifting column (Bollard and pole) can realize the free rise and fall of the cylinder by some kind of signal.

 

Stainless steel road piles (Bollard and pole) are classified according to control methods

  • Control method: wireless remote control, push button switch, card reading, geomagnetic induction, license plate recognition, etc.
  • The automatic road pile is also called automatic lifting column, road pile (Bollard and pole), isolation column, guard column and anti-collision column. It is divided into civilian and military levels.
  • The civil level mainly applies villas, residential areas, pedestrian streets, etc., to discourage the main purpose, to manage vehicle traffic.
  • The military level is to have a certain degree of security and anti-terrorism awareness, to prevent the car from entering, such as driving to escape, purposeful collision, car bombs and so on.
  • Military high security and anti-terrorism level road piles (Bollard and pole) are mainly used in prisons, public security systems, military bases, banks, embassies, airport VIP passages, government VIP passages, schools and other places. There are also some civilian equipment, the impact resistance is slightly lower, mainly used in stadiums, villas, pedestrian streets and so on.

 

Stainless steel road pile (Bollard and pole) installation method

  • Installation tools: power supply with tens of meters of wire, electric drill (drill 12 or 14), hammer, nut ferrule, tape measure, expansion screw (m10*10 or m10*8).

Installation method:
1. Use the tape measure to position it and then square it.
2, connect the power supply, first use the electric drill to align the screw hole to make a mark, then take the open pile to align the mark and punch, the electric drill should be positive, the depth should be about the length of the screw.
3, from the new straight road pile, the screw is inserted into the hammer with a hammer, and finally tightened with a nut sleeve.

  • Automatic lifting road pile installation method

1. Determine the groundwater level. If the groundwater is rich, it is recommended to configure the drainage system.
2. Ground excavation, according to the height of the embedded parts, another 20cm drainage pipe should be reserved.
3. Make concrete cushion, about 20cm
4. Lifting column is fixed in place
5. System wiring
6. Foundation pouring

 

Some of our projects

 

Hot Products

Stainless Steel Bollards Warning Pole Column And Stake Pile For Road Building Stainless Steel ...
Stainless Steel Bollards Warning Column Pole And Stake Pile For Road Construction Stainless Steel ...
Stainless Steel Bollards Warning Column Pole And Stake Pile For Road Stainless Steel Bollards ...
Stainless Steel Bollards Warning Column Pole And Pile Stake For Road Construction Stainless steel ...
Custom Stainless Steel Bollards Warning Column Pole And Stake Pile For Road About Custom Stainless ...
Stainless Steel Bollards Warning Column Pole And Stake Pile For Construction Road About Custom ...