Home Companies Sinuo Testing Equipment Co. , Limited

IEC 60112 CTI PTI Tracking Flammability Test Chamber PLC Control

Sinuo Testing Equipment Co. , Limited

Contact Us

[China] country

Trade Verify

Address: Room 101, 1st Floor, No. 6, Third Street, Pingshan Industrial Zone 511495, Shibi Street, Panyu District, Guangzhou, China

Contact name:Zoe Zou

Inquir Now

Sinuo Testing Equipment Co. , Limited

Verified Suppliers
  • Trust
    Seal
  • Verified
    Supplier
  • Credit
    Check
  • Capability
    Assessment

IEC 60112 CTI PTI Tracking Flammability Test Chamber PLC Control

Country/Region china
City & Province guangzhou guangdong
Categories Other Chargers
InquireNow

Product Details

 

IEC 60112 Leakage Tracking Test Apparatus

 

Product overview:

The leakage tracking test equipment is designed and manufactured according to the standard requirements of IEC60112, it is required by IEC60335-1 clause 29.2 and Annex N, IEC 60065:2014 clause 13.4, IEC60598-1, IEC 60884-1, UL746A and ASTM D3638-92 and etc. It is used for determination of the relative resistance to tracking performance that solid electrical insulating material under the action of an electric field, when the surface exposed to water containing impurities.

 

The leakage tracking tester adopts to advanced PLC control system and humanized 7” color touch screen, the dripping is controlled by a high-precision micro water supply pump, the timing is automatic, the electrode pressure sensor is accurate, and the operation is simple, accuracy is high, it is leading among similar equipment.

 

Technical parameters:

 

Parameter modelSN774 (0.5m³)
Working voltageMatch client's local power supply requirements
ControlAdvanced PLC
Display7 inch color touch screen
Testing voltage0~600V adjustable, precision 1.5%
Timing device9999X0.1S
ElectrodePlatinum electrodes and brass electrodes, each of a pair
Electrode dimension

(5±0.1)×(2±0.1)×(≥12),

30°slant

Electrode included angle and distance60°±5°, distance is (4±0.1) mm
Electrode pressure1.00N±0.05N
The interval of dropping liquid30±5S, adjustable
Dropping liquid height35±5mm
Dropping liquid delay0.2S(solenoid valve opening time)
Dropping liquid volume45~50 drip/cm3
Time-delay circuit2±0.1S (in 0.5A or larger current)
Short-circuit pressure drop8% MAX
Short-circuit current

1±0.1A

Accuracy: 1%

Wind speed0.2m/s
Environmental requirement0~40℃, relative humidity≤80%, in the place of no obvious vibration and corrosive gas
Equipment size & weight1100mm* 620mm* 1450mm, 180KGS
conforms to standardIEC60695, IEC60112, IEC 60598-1, IEC 60884-1, UL746A, ASTMD3638, etc.
 

 

 

Hot Products

IEC60456 Water Supply System For Washing Machine Performance Test System overview The test system is ...
Freezing Load Test Package for IEC 62552 Refrigerator Energy Efficiency Test Overview: The ...
ISO 5151 60K BTU Computer Control Dual Code Air-Enthalpy Calorimeter System introduction: The air ...
60K BTU Double Code Air-Enthalpy Method Calorimeter ISO 5151 System introduction: This air enthalpy ...
30K BTU Single Code Test Laboratory Air Enthalpy Method Calorimeter System overview This air ...
IEC 61591 Air Performance Test System for Cooking Fume Extractors Technical parameters: 1. ...