Home Companies Zhongyuan Ship Machinery Manufacture (Group) Co., Ltd

Double Gypsy Double Warping End Boat Electric Hydraulic Anchor Windlass Ship Deck Equipment

Zhongyuan Ship Machinery Manufacture (Group) Co., Ltd

Contact Us

[China] country

Trade Verify

Address: High-tech Industrial Park, Jiangyan City, Jiangsu Province PR China

Contact name:Harry Wang

Inquir Now

Zhongyuan Ship Machinery Manufacture (Group) Co., Ltd

Verified Suppliers
  • Trust
    Seal
  • Verified
    Supplier
  • Credit
    Check
  • Capability
    Assessment

Double Gypsy Double Warping End Boat Electric Hydraulic Anchor Windlass Ship Deck Equipment

Country/Region china
City & Province jiangsu
Categories Other Tools
InquireNow

Product Details

Double Gypsy Double Warping End Electric Hydraulic Anchor Windlass Ship Deck Equipment

 

Description

The electric hydraulic windlass is mainly used to retract and release anchors and anchor chains. Including chain stoppers, chain barrels, chain cables, chain lockers and chain droppers are installed on the main deck of the ship's fore and stern for the ship to lift anchors and drop anchor mooring lines.
 

Main Technical Specifications:

1. Anchor chain diameter: Φ40mm

2. Anchor load: 68KN

3. Tether load: 68KN

4. Rope capacity: 150m

5. Tethering speed: 6-18m/min

6. Motor power: 30KW

7. Classification Certificates: CCS, NK, BV, ABS, DNV-GL, LR, KR, BKI, IRS, RS, Etc.

 

Installation knowledge:

As everyone knows, the hydraulic windlass is the main deck machinery of the ship, while the hydraulic motor is the main “joint” for the operation of the anchor winch. Its installation requires certain steps to ensure its normal operation and ensure the hydraulic pressure. The work efficiency of the windlass.

1. The chain depressor is set between the windlass and the chain cylinder to clamp the chain and protect the windlass with external force when anchoring. When sailing, use it to fasten the anchor and bear the weight of the anchor, and prevent the chain from bounce and hit the deck.

2. The installation of the base on the ship adopts screw connection

3. After the deck welding and pyrotechnics verification are all completed, the base must be trimmed with gas cutting so that the lower edge of the bracket of the base is tightly connected to the deck. The gap should not be greater than 2mm. At the same time, check the level of the plane on the base. Both sides of the bow of the anchor chain tube pass through the deck and the shell plate, and are composed of three parts: the deck chain hole and the tube body, which are the hole heads for the anchor chain to enter and exit the hull and to store the anchor rod. The anchor chain barrel is provided with water spray holes for washing the anchor chain, and the water is taken in from the deck water pipe to wash the anchor chain when the anchor is lifted. In order to prevent seawater from rushing onto the deck from the chain cylinder and to ensure the safety of personnel, a wave cover is provided at the chain hole of the deck. Can be hung on the base for installation.

4. Weld the base and the deck according to the requirements of the process drawing, first spot welding and positioning, and then weld the maximum length of 100mm on each side according to the drawing, cross it, and then proceed gradually. The welding seam must be dense, and the height of the bracket welding foot shall be in accordance with the requirements of the drawing.

5. Anchor chain pipe is a pipeline for the chain to enter and exit the chain cabin. Installed directly under the left and right chain wheels of the windlass, facing the center of the chain cabin, its diameter is 7-8 times the chain diameter. The deck nozzle of the chain pipe is equipped with a waterproof cover, which shall be closed after sailing to prevent seawater from entering the chain cabin.

 

Main Technical Parameters:

Size of Chain
(mm)
Working Load
(KN)
Holding
Capacity
(KN)
Speed
(m/min)
Warping End Load
(KN)
Motor Power
(KW)
12.55.930≥954
14/16/17.58.3/10.9/1351/67/80≥985.5
19/20.5/2215.3/17.9/20.695/110/126≥9107,5
24/2624.5/28.7149/175≥92011
28/3033.3/38.3202/231≥93015
32/34/3643.5/49.1/55.1261/294/3 29≥93022
38/40/4261.4/68.0/75.036.5/402/442≥94030
44/46/4882.3/89.9/97.9483/526/570≥95037
50/52/54106.3/114.9/123.9617/664/713≥95045
S6/58/60133.3/143/153764/816/870≥96055
62/64163.4/174.1925/982≥98055
66/68185.1/196.51040/1098≥910075
70/73208.3 /226.51160/1254≥910075
76l78245.5/258.61350/1416≥912590
81/84311.7/335.22171/2320≥9140110
87/90359.5/384.82473/2629≥9150120
92/95402.0/428.7273.5/2898≥9200130
97/100446.9/475.02995/3162≥9250150
105/107523.7/543.83612/3750≥9300180
112/114595.8/617.34109/4228≥9350200
 

 

 

Drawing of Double Gypsy Double Warping End Boat Electric Hydraulic Anchor Windlass Ship Deck Equipment

 

 

Hot Products

Marine Electric Vertical Anchor Windlass Mooring Capstan Ship Deck Equipment Description: Vertical ...
Two Hooks Horizontal Gantry Provision Crane Ship Deck Equipment Description Cranes are designed and ...
Double Gypsy Double Warping End Electric Hydraulic Anchor Windlass Ship Deck Equipment Description ...
High Deck Stand Vertical Electric Mooring Capstan for Barge Ship Deck Equipment Description: The ...
CB/T 3468-92 Type B Mooring Rope Reel Steel Wire Rope Storage Reel With Lever Ship Deck Equipment ...
Electric Engine Room Gantry Crane Ship Deck Equipment Description: Engine room crane is electric ...