Home Companies Jiangyin Dingbo Technology Co., Ltd

Durable Steel Shutter Door Roll Forming Machine High Speed

Jiangyin Dingbo Technology Co., Ltd
Active Member

Contact Us

[China] country

Address: No. 1, Xingyuan Road, Gu Shan Town, Jiangyin city, Jiangsu Province, China

Contact name:Emma Teng

Inquir Now

Jiangyin Dingbo Technology Co., Ltd

Durable Steel Shutter Door Roll Forming Machine High Speed

Country/Region china
City & Province jiangsu
InquireNow

Product Details

 
Durable Steel Shutter Door Roll Forming Machine High Speed
 
Product Description

 

 

Drawing for you reference:

 

Parameters:

Material specificationAluminum, galvalume, galvanized and pre-painted galvanized steel.
Thickness0.3 mm to 0.7mm.
Main motor power4 kw.
Hydraulic station power3 kw.
Feeding widthDepends on the model of profile.
Yield stress235Mpa(33KSI) ~ 345Mpa (50KSI).
Roll forming Speed12 m/minute.
Cutting Tolerance+/-2.5mm(length≤5000mm); +/-3.0mm(5000mm<length≤10000mm).
Manual UncoilerMax. Capacity: 3000kgs.
Coil inner diameter508mm.
VoltageAs per customer’s request.
Numbers of stands12 stands/stations/pairs for each roll forming system.
Type of cuttingRoll-formed and length-set profile cutting.
Roller MaterialHigh grade No.45 forged steel, coated with hard chrome.
Active Shaft Material

High grade No.45 carbon wrought steel,

which can improve the integrated mechanic feature of the shaft.

Electric Elements

PLC control panel, transducer imported from Mitsubishi of Japan.

Other elements are from famous suppliers of China.

Cutter bladesCr12 mould steel with quenched treatment.

 

Working steps:

Uncoiling the sheet --- Infeed guiding --- Roll forming --- Rectifying the straightness ---

 

--- Measure length --- Cutting the panel --- panels to the supporter (option: automatic stacker).

 

After-sale Serive

The seller take responsibility to installation and commissioning of the equipment and free training. After machine arrive the destination, by the request of the buyer , the seller will provide 1 technical engineer to guide installation and training , and the buyer should give the technical person with full cooperated.
Installation period: about 5 days after the complete preparation by the buyer such as the foundation and all necessary accessories.
Training time: 5 days.
Before departure of the engineers from seller, the buyer should pay for installation and commissioning fee 100$/day to the point account of the seller. The two-way ticket,visa, food, hotel , the translator and insurance are all should provide by buyer with full responsibility.
The seller supply technical data (including forming mould drawing, electrical elements drawing and equipment drawing etc.)

Hot Products

Downpipe Cold Roll Forming Machine Technical Specification Material Thickness 0.45-0.6mm Decoiler ...
Downpipe Cold Roll Forming Machine Technical Specification Material Thickness 0.45-0.6mm Decoiler ...
Speedy Auto Steel Forming Machines Plc Control Roll Forming Machinery Product Description Steel door ...
Automatic Cold Roll Forming Machine Door Frame Roll Form Machine Product Description Drawing for you ...
Durable Steel Shutter Door Roll Forming Machine High Speed Product Description Drawing for you ...
High Speed Door Frame Cold Roll Forming Machine With Hydraulic System Product Description Our Dynamo ...