Home Companies Henan K-Home Steel Structure Co., Ltd.

Emergency Temporary Prefabricated Hospital Construction

Henan K-Home Steel Structure Co., Ltd.
Active Member

Contact Us

[China] country

Address: 843 Room, Guomao Mansion, No.356 Xin'er Street, Hongqi District Xinxiang, China.

Contact name:Ava Liu

Inquir Now

Henan K-Home Steel Structure Co., Ltd.

Emergency Temporary Prefabricated Hospital Construction

Country/Region china
City & Province xinxiang henan
Categories Workshops & Plants
InquireNow

Product Details

 

Emergency Temporary Prefabricated Hospital Construction

 

Because of the large number of patients and the limited number of beds in hospitals,

how to accommodate more patients is bound to become a thorny problem for hospitals and the government.

The thorny problem is reflected in several aspects, one is the problem of space, the other is the problem of time.

The space problem is "how to accommodate so many people in a certain space"; the time problem is "how to quickly and safely treat patients".
And our modular hospital construction, perhaps, is exactly what you need.


Features of our Modular Hospital Construction:

 

1. First of all, the construction cycle of mobile container hospital is short.
Modular building is a new building structure system, which takes each room as a module unit, prefabricated in the factory,

transported to the site after completion, and assembled into a whole building through reliable connection.

It can be simply understood that according to the function and the number of units in advance,

the prefabricated boards and connectors can be used as children's building blocks and toys to combine the units into a building space.

 

2. Secondly, the stability of modular hospitals is high.

Each room and overall structure of the hospital is composed of steel frames and customizable functions,

such as various restaurants and toilets, doors and windows, as well as additional facilities such as porch and garage.

Although there are only some modular designs, housing helps to introduce the concept of modularity to the public.

This not only allows more patients to be treated in a short time but also improves the reputation of the hospital.

 

3. Finally, the cost of prefabricated hospital construction is low.

When the natural disaster comes, it is too late to build the traditional reinforced concrete hospital, and the

traditional construction method is not only high cost, long cycle but also not high practicability.

The modular hospital recommended by our company is not only short in the construction period but also

convenient in transportation and movement. It can follow you to the place you need.

Because of its convenient disassembly and assembly, it is very popular with the government departments of public facilities.

 

Flat pack modular container Detail Specifications:

 

Roof System: Made of 4 parts: steel ceiling+roof purlins+glass wool insultion material+roo steel sheet.

There are also 4 big water gutters to store rainwater and flow naturally. And there are 4 drainpipes in each column,

so the rainwater will flow from the roof steel sheet, into the water gutters, at last flow from the drainpipes orderly.

 

Bottom System: Composed of purlins, fireproof MGO board and PVC floor leather.

 

Wall Panel: Standard rockwool sandwich panel, it is fireproof. There are other options to choose.

According to your local environment, we can provide you a suitable solution.

 

Steel Frame: Galvanized steel frame, the thickness is 2.3mm. It is very thick. Surface spray treated by machine after repeatedly polished.

So it is double protection.

 

Door and Windows: 

● Steel door, the interior of the door is filled with composite wood to make the door heavy and strong; It is fireproof;

● PVC steel sliding double glass window, with screens and anti-thief bar.

 

Accessories:

● Electricity system, including light, switch, socket, air breaker and wires, these can meet your site normal use.

● Internal skirting line, to decorate the inside. The material is PVC.

● Sealing strip, used on the joint between wall panel and steel frame, to better prevent rainwater and humid air go inside.

● Sealant glue, after installation, you need to seal every gaps.

 

Project Show:

 

 

Hot Products

Emergency Temporary Prefabricated Hospital Construction Because of the large number of patients and ...
Portable Field Container Houses As Hospital And Clinics Field clinics are being set up to relieve ...
Quickest Way To Build A Container Hospital Modular Construction The purpose of Container Hospital is ...
Best Portable Modular Container Clinic Solutions After decades of container use, we have seen many ...
Temporary Prefabricated Modular Health Clinics Prefabricated Modular Health Clinics can be easily ...
Emergency Medicaid Prefabricated Modular Container Hospital Construction As the epidemic continues ...