Cangzhou Jiansheng Building Waterproof Material Co.,Ltd |
|
Building Construction Hot Melted 4mm Sbs Modified Asphalt Roofing Membrane For Undergroud
Asphalt roofing membrane introduction:
SBS elastomer modified asphalt waterproofing membrane is made of SBS rubber modified petroleum asphalt as infiltration coating layer, polyester fiber non-woven fabric, jute cloth, glass fiber felt, etc. are respectively made into tire base, and plastic film is used for anti-adhesion. The separation layer is processed by the steps of material selection, compounding, eutectic, infiltration, composite molding, and curling.
Asphalt roofing membrane characteristics:
a) SBS modified bitumen water proofing membrane is specially used
as waterproof material in cold area
b) APP is specially suitable for areas of high temperature and of
strong sun-shine SBS/APP Modified Bitumen Water proofing Membrane
c)Good performance in Good impermeability ,anti-puncture,
anti-broker, anti-resistance, anti-erosion, anti-mildew,
anti-weathering
d)Possess good tensile strength, elongation rate and size stability
which could be well suited the substrate distortion and crack
Asphalt roofing membrane advantage:
1. Strong water impermeability.
2.High tensile strength, high elongation, strong adaptability to
base layer shrinkage deformation and cracking.
3.Good low temperature performance, can maintain efficacy at -50
°C, suitable for hot and cold areas, especially in cold regions.
4.Puncture resistance, smash resistance, tear resistance.
5. Corrosion and mildew resistance. Good weather resistance.
6.Convenient construction, hot melt method can be operated in all
seasons, and the joints are reliable.
Asphalt roofing membrane applying method:
1, brushing base treatment agent (same cold construction method)
2. The coil is placed at a predetermined position, and the base
layer and the bottom surface of the coil are heated by a liquefied
gas or a gas oil blower. After the surface asphalt is melted by a
thin layer, the coil is rolled forward while being baked, and
compacted by a press roll. Adjust the size of the flame, melt the
asphalt on the surface of the coil, do not flow too much, and can
not be baked.
3, the coil is overlapped in the vertical and horizontal directions
of 10CM, and sealed with a blowtorch.
4, double waterproof, coil joints must be staggered according to
regulations.
5, the thickness of the coil is less than 3 mm or the cladding
material is aluminum film is not suitable for hot melt
construction.
Soluble substance contentg/≥ | 2100g/m2 |
Impermeable | 0.3mpa |
Heat tolerance,℃ | 90degree No sliding, flowing, dripping |
pull,N/50mm≥ | 500 |
Elongation at maximum tension,≥ | 30 |
Low temperature flexibility,℃ | -20 |