Topland Oilfield Supplies Ltd |
Verified Suppliers
|
|
DSJ8 - D Wire Spooling Machine Drilling Rig Spare Parts Drilling Line Spool
Wire Spooling Machine Description of Solids Control Equipment
Wire Spooling Machine to through and back the drill line. It is equipped with a wire drum and it can complete reel the drill line before drilling and release the drill line after the drilling, no need other auxiliary equipment and tools. The work more convenient and safety, easy to operate.
Drilling Spare Parts Wireline Spooler Technical Parameter
SPEC/Model | DSJ8-D | DSJ15-D | DSJ8-Y | DSJ15-Y | DSJ15-Q |
Drive Type | Electric | Hydraulic | Pneumatic | ||
Support Spacing (mm) | 1260 | 1320 | 1260 | 1320 | 1320 |
Height of Center (mm) | 1105 | 1640 | 1105 | 1640 | 1640 |
Rated Output Torque (kN.m) | 10 | ||||
Rated Speed (RPM) | 3.7-18 | 0.55-17.5 | 0.5~13rpm | ||
Motor Power (kw) | 5.5kw (380V/50Hz 460V/60Hz) | 7.5kw (380V/50Hz 460V/60Hz) | |||
Hydraulic Pressure (MPa) | 16MPa Flow:100L/min | ||||
Gas Consumption | ≤15m3/min(≈6 m3/min) | ||||
Max Load (Ton) | 8 | 15 | 8 | 15 | 15 |
FAQ
1. Who are we?
Topland is an integrated supplier established in 2008. We are a
global group of oilfield supplies with excellent teams in more than
5 countries. such as UAE, Kuwait, Iran and Saudi Arabia. We cooperated with ADES, ECDE, EDC, SOCAR-AQS, PDL, SAKSON, ONGC
etc.
2. How can we guarantee quality?
Always a double requirements and drawing checking before the
production;
Always final Inspection before shipment;
3. What can you buy from us?
Drilling rig equipment and the related spares for the oil and
natural gas industries. Like Rig Components, Drawworks Spare parts
and Mud Pump Spare parts, Hydraulic Disc Brake,Solids Control
Equipment, Drilling and Fishing Tools,Wellhead Control
Equipment,Drilling Accessories, Cementing Equipment and Tools etc.
4. Why should you choose us?
4-1. Professional & Efficient, Customer Focus, Win-win
Cooperation
4-2. Fast Quote, Competitive price & within shortest lead time
4-3. Complete Range of products, like spare parts which are interchangeable with most of the well-known OEM equipment.
4-2. Order tracking service
5. How is the packing?
All the packing will meet the strict export packing requirement, we surely know how important the beautiful and firm packaging to the goods.
6. What is your terms of payment?
A: Generally by T/T, 30% advance payment, the balance 70% payment should be paid before delivery. We support EXW, FOB, FCA, CFR, CIF, CIP, DAP, DDU and DDP INCO Terms.