Home Companies Hebei Kaixiang Electrical Technology Co., Ltd

Triumph Load 400V 2000kw 3 Phase Load Bank For Generator UPS Testing

Hebei Kaixiang Electrical Technology Co., Ltd
Active Member

Contact Us

[China] country

Address: No33 Wangshan Road, Green Island Economic Development Zone, Shijiazhuang, China

Contact name:

Inquir Now

Hebei Kaixiang Electrical Technology Co., Ltd

Triumph Load 400V 2000kw 3 Phase Load Bank For Generator UPS Testing

Country/Region china
City & Province shijiazhuang hebei
Categories Uninterrupted Power Supply (UPS)
InquireNow

Product Details

 
Triumph load 400V 2000kw 3 Phase Load Bank For Generator UPS Testing
 
Product Description 
 
The system can accurately test output power and load capacity with all kinds of generators. System consists of testing/control and load bank, mainly includes AC load bank, data capture system, auto load/unload control system, heat dissipation device, assist control and PC software. User can control load bank through local control panel, also through software.
 
Technical Parameter 

Rating Voltage/Frequency400VAC/50Hz, 3 phase 4 wire,
Rated Load PowerResistive load: 2000kW
Installed CapacityResistive load: 2000kW
Load Step1,2,2,5,10,10,20,50,100,100,200kW*9, total 19 steps, 
PF(Power Factor)1
Load Tolerance (each step)±5%
Load Tolerance(overall)±3%
Display Precision0.5 class
Control Power380VAC/50Hz, 3 phase 4 wire,
Wire Connection

Load power supply input——Copper bar (star coupling)
Control power supply input——terminal block

InsulationF
Protection GradeIP21
Way of WorkingContinuous Working
Casing Dimensions and Coolingabout 4000*2350*2591mm (length*width*height) Forced air cooling,Horizontal inlet air,Vertical cooling
WeightAbout 5500kgs/set
TransportationHoisting, there are lifting lug in top of casing
Casing ColorGrey(RAL7035)
Ambient Temperature-10℃~+50℃
Relative Humidity≤95%
Altitude≤1500 meter
Atmospheric Pressure86~106kPa
ContactorSchneider
FuseDELIXI
MCUINFINEON
Data processing softwareKaixiang(self-developed)
Alloy ResistanceKaixiang(self-developed)

 
Product Advantage
 
Communication type: through RS232, RS485
Load mode: manual load or automatic load.
Manual load: input power and power factor.
Automatic load: User can set several periods of power and time, and in turn of 0%→25%→50%→75%→100%, etc preset order to make automatic load testing.
Parallel testing: when several load banks parallel working, parameters of each load bank can be displayed and recorded, so do the final parameters of paralleling working.
 
Application

 

1.Manufacturers of small gas engines also use load banks to test newly manufactured engines under various mechanical loads.
2.This is accomplished by connecting the engine to the load bank via a device called a dynamometer.
3.engine performance is monitored and, if necessary, adjustments are made to ensure the product performs within intended specifications.

 






















Hot Products

3 Ph Power Banks Electrical Load Equipment Testing With Copper Conductor Introduction The load bank ...
Power Banks 2500 KW 3 Ph Ac Load Bank Electric For Testing Generators UPS etc Product description (1...
Waterproof Power Banks 3546 KVA Resistance Load Bank For Diesel Generator AC3546KVA 3 Phase Load ...
Triumph load 400V 2000kw 3 Phase Load Bank For Generator UPS Testing Product Description The system ...
5000 KW 3 Phase Load Bank / Resistive Load Bank For Generator Testing Product description AC415...
AC 250KW Auto Testing Portable Load Bank For Thailand Generator ups Testing Introduction AC415-250kW ...