Hebei Kaixiang Electrical Technology Co., Ltd |
|
Professional Design And Produce 400v 200kw Genset Test Dummy Load
Bank
Product Description
The system can accurately test the output power and load capacity
of various generator sets.The system consists of two parts of
measurement and loading, including AC load bank, data acquisition
system, automatic load and drop control system, cooling device,
auxiliary control,PC software,and so on.The user can freely select
local control or software control to operate the load bank.
Technical Parameters
Rating Voltage/Frequency | 380VAC/50Hz, 3 phase 4 wire |
Rated Load Power | Resistive load: 200kW |
Installed Capacity | Resistive load: 200kW |
Load Step | 1,2,2,5,10,10,20,50,100kW, min step load: 1kW |
PF(Power Factor) | 1 |
Load Tolerance (each step) | ±5% |
Load Tolerance(overall) | ±3% |
Display Precision | 0.5 class |
Control Power | 400VAC/50Hz, 3 phase 4 wire, 230V 1-phase |
Wire Connection | Load power supply input——Copper bar (star coupling) |
Insulation | F |
Duty Cycle | Continuous |
Casing Dimensions and Cooling | about 700*500*300mm (length*width*height) Forced air cooling,Horizontal inlet air,Horizontal outlet air |
Weight | About 300kgs/set |
Transportation | Hoisting, there are lifting lug in top of casing |
Casing Color | Grey(RAL7035) |
Ambient Temperature | -10℃~+50℃ |
Relative Humidity | ≤95% |
Altitude | ≤1500 meter |
Atmospheric Pressure | 86~106kPa |
Contactor | Schneider |
Fuse | DELIXI |
MCU | INFINEON |
Data processing software | Kaixiang(self-developed) |
Alloy Resistance | Kaixiang(self-developed) |
Product Advantage
1. Super Power Load: high load power density, large capacity of
single set, parallel running to finish super power testing, and
realize tens of megawatts of power loading.
2. Accurate Data: with high precision data collection module and
measuring meter, related equipment has passed the certification by
CMA (China Metrology Accreditation) qualification testing
institution, and ensure the reliability of data.
Application
1.Manufacturers of standby power generators commonly use load banks
to test and tune newly assembled units
2.generator has been set up in a test cell within the factory, a
test engineer uses the load bank to apply a discrete, selectable
electrical load to the generator and measure the response stability
and endurance.
3.During this process, the test engineer calibrates and adjusts the
generator performance to ensure it meets the intended product
specifications and tolerances.