Product Description
1.Supply most robust, high-capacity designs
2.intelligent operator controls,safety indication layouts, adjustable load step resolution, and lightweight designs
3.solution for regularly scheduled maintenance testing and commissioning of mission-critical standby emergency power systems
Technical Parameters
Rating Voltage/Frequency | 400VAC/50Hz, 3 phase 4 wire, |
Rated Load Power | Resistive load: 200kW |
Installed Capacity | Resistive load: 200kW |
Load Step | 1,2,2,5,10,20,20,50,100kW, min step load: 1kW |
PF(Power Factor) | 1 |
Load Tolerance (each step) | ±5% |
Load Tolerance(overall) | ±3% |
Display Precision | 0.5 class |
Control Power | 220VAC/50Hz, 1 phase |
Wire Connection | Load power supply input——Copper bar (star coupling) Control power supply input——three pin socket |
Insulation | F |
Duty Cycle | Continuous |
Casing Dimensions and Cooling | about 1450*900*870mm (length*width*height) Forced air cooling,Horizontal inlet air,Horizontal outlet air |
Weight | About 200kgs/set |
Transportation | Hoisting, there are lifting lug in top of casing |
Casing Color | Grey(RAL7035) |
Ambient Temperature | -10℃~+50℃ |
Relative Humidity | ≤95% |
Altitude | ≤1500 meter |
Atmospheric Pressure | 86~106kPa |
Contactor | Schneider |
Fuse | DELIXI |
MCU | INFINEON |
Data processing software | Kaixiang(self-developed) |
Alloy Resistance | Kaixiang(self-developed) |
Product Advantage
New Load Bank Technology: using the international advanced AC load bank technology, overcome the old water bank defects, such as bear bumpy, unable to use when go to sea, realize Mooring Trial and Sea Trail, and simulate the real working condition of generator running.
Application
Generators installed in the field must be periodically tested and exercised to ensure that it will operate as intended when a power outage actually occurs. Service groups use load banks to apply a load that mimics the load of the facility the generator is protecting. Any problems with the generator can then be identified and rectified in a non-critical environment.