Home Companies Hebei Kaixiang Electrical Technology Co., Ltd

3 Phase 3 Wire High Power Resistor Load Bank For Australia Generator Testing

Hebei Kaixiang Electrical Technology Co., Ltd
Active Member

Contact Us

[China] country

Address: No33 Wangshan Road, Green Island Economic Development Zone, Shijiazhuang, China

Contact name:

Inquir Now

Hebei Kaixiang Electrical Technology Co., Ltd

3 Phase 3 Wire High Power Resistor Load Bank For Australia Generator Testing

Country/Region china
City & Province shijiazhuang hebei
Categories Diesel Generators
InquireNow

Product Details

In Australia 10.5KV 1800KW Medium Voltage Load Bank For Generator Testing 
 

Product Description
 

1. our load bank an accurately test output power and load capacity with all kinds of generators.

2. System consists of testing/control and load bank, mainly includes AC load bank, data capture system, auto load/unload control system, heat dissipation device, assist control and PC software.

3. User can control load bank through local control panel, also through software


Technical Parameters

 

Rating Voltage/Frequency10.5kV/50Hz, 3 phase 3 wire
Rated power1800kw
Max load power30MW
Load ResolutionResistive Load: 100KW*2.200KW*1.400KW*2.600KW*1
PF(Power Factor)1
Load Tolerance (each step)±5%
Load Tolerance(overall)±3%
Display Precision0.5 class
Control Power380VAC/50Hz,
WeightAbout 8000kgs/set
Wire Connection

Load power supply input——Copper bar (star coupling)

Control power supply input——Connector-bar

Size6058*2438*2591mm

 
Technology Advantages 
 

1. Communication Mode:RS485/ USB or RS232 interface for communication.

2. Load Mode: manual load or automatic load

3. Manual Load: input power and power factor, and load according to the preset value.

4. Automatic Load: set several load stages and duration, then complete the process according this stages automatically. 0%- 25%,- 50%,- 75%, -100%

 
Application

 

1. Manufacturers of standby power generators commonly use load banks to test and tune newly assembled units

2. generator has been set up in a test cell within the factory, a test engineer uses the load bank to apply a discrete, selectable electrical load to the generator and measure the response stability and endurance.

3. During this process, the test engineer calibrates and adjusts the generator performance to ensure it meets the intended product specifications and tolerances.

 

 

Hot Products

Three Phase Good Service After Sale 10KV 3000KW Medium Voltage Load Bank Product Description The ...
Three Phase Fan Cooling System 11kV 21MW Medium Voltage Load Bank Product Description 1. It is of ...
High Voltage Capacitor Tester 10.56KV 3KV 50MW Medium Voltage Load Bank Product Description load ...
Display Voltage And Current 10.5KV 2200KW Medium Voltage Load Bank Product Description 1. Supply ...
In Australia 10.5KV 1800KW Medium Voltage Load Bank For Generator Testing Product Description 1. our ...
Generator Testing 10.5KV 30MW Medium Voltage Load Bank In Asia Product Description The system can be ...