Home Companies JINQIU MACHINE TOOL COMPANY

Large Area Aluminum Frame Slab Formwork System Easy Installion For Concrete

JINQIU MACHINE TOOL COMPANY

Contact Us

[China] country

Trade Verify

Address: 99.QIANLUO ROAD QIANQIAO WUXI JIANGSU PROVINCE CHINA

Contact name:Tony Zou

Inquir Now

JINQIU MACHINE TOOL COMPANY

Verified Suppliers
  • Trust
    Seal
  • Verified
    Supplier
  • Credit
    Check
  • Capability
    Assessment

Large Area Aluminum Frame Slab Formwork System Easy Installion For Concrete

Country/Region china
City & Province wuxi jiangsu
Categories Formwork
InquireNow

Product Details

Large Area Aluminum Frame Slab Formwork System Easy Installion For Concrete

 

140 Aluminum frame slab formwork Supply Ability:
10000-20000 Square Meter/Square Meters per Month.

 

Packaging & Delivery

Packaging Details :In Pallets & in Wooden Cases

Port of departure : SHANGHAI port

Lead Time : 10000 Square meters for 30 days or negotiation

 

12000 square area Large Forming Area and Quick Operation Modular Slab Formwork

We have a wide range of products line which covers wall formwork, slab formwork, column formwork, climbing formwork,
slip formwork, girder, plywood, shoring prop, and all kinds of scaffoldings. They are widely used in residential & commercial buildings,
fly-over roads, bridges, tanks, damsand other civil engineering projects.

Aluminum frame slab formwork Product details
Name:
Large Forming Area and Quick Operation Modular Slab Formwork
Material 6061-T6 Aluminum Alloy&Plywood&Steel accessories
Usage:
Modular panel 1.2*1.8m&1.2*1.5m can be erected by 3 men without the tower crane.

Modular slab formwork system is uniquely designed for faster erection and stripping.

Early stripping drop head with shoring props can be left to support the slab after stripping the slab modular panels.

Length As per Customers' Requirement
Type Concrete Formwork
Feature Light weight, durable
Panel Size 1.2*1.8m&1.2*1.5m
Certification ISO
Finish Raw


Aluminum frame formwork Advantage
Light weight

Aluminum frame for the formwork panel is made of aluminum alloy 6061-T6. It is much lighter weight compared

with steel formwork.

Cost Saving

Assembled easily with shoring prop, drop head and panels.

With early Stripping application, the user only need buy one floor of formwork panels and 2 floors of shoring prop,

but can finish two floors with cycle time 7-10 days per floor.

Improve Efficiency

Large forming surface improve construction speed.

Our Service
* Consultancy
Offer you a general idea of formwork & scaffold among TECON various systems, to fit your project demand.
* Technical Planning
Customized forming & shoring solution proposal according to your structural drawing by Auto-cad.
* Order Delivery
From fabrication to loading, fast to your site with standard export packages.
* On-site Supervision
Shop drawing, user manual, and even send our supervisor to your site for training and supervision.

detail of top deck bearing and early dismantling bearing

aluminum frame formwork application in real projects

Hot Products

Large Area Aluminum Frame Slab Formwork System Easy Installion For Concrete 140 Aluminum frame slab ...
DHD Standard seamless Steel Drill Tube Weighted Drilling Pipe Tool High Torque 3M Heat treatment ...
6061-T6 Aluminum Concrete Frame Formwork System For House Building Made in China Advantages of ...
Stator Rotor core stamping Machine Motor asselmbly Hydraulic Press machine Y32-160T new type servo ...
Ball Screw/round bar Straightening Press Machine 80T Capacity Press 4m Length Worpiece supply ...
High Strength Alloyd Horizontal directional drilling pipe tooling for HDD machine Charater of ...