Dongguan Kingrui Precision Mould Co.,LTD |
|
Precision Mold Parts With SKD61 By Sodick Spare Parts Plastic Mold
Product information
Item Name | Precision mold parts/ auto plastic mold insert parts
|
Machining Equipment |
Grinding Machines / EDM machines, etc.
|
Precision | Hardness: HRC52-54° |
Material Brand | ASSAB, SAARS TA, DAIDO, AISI, etc. |
Delivery | Usually 5- 7 days , it depands on the quantity and complexity of order. |
Product's Design and Production | As per client's drawing or sample |
QC System | 100% inspection before shipment |
File Formats | 2D-- dxf & dwg & pdf; |
Payment | T/T 50% as deposit 50% before shipment .
|
Specification/ Information
16 years machining parts processing experience; Precision tolerance less than 0.001mm; Depends on customer’s requirements.
Delivery
Shipping in 5-9 working days after receive the payment.
Payment terms
T/T, L/C, Paypal, Western Union or negotiable
QC (inspection verywhere)
- Technicians self-check in production
- Engineer spot check in production.
- QC inspect after products finished
- International sales who were trained the technical know-how spot check before shipping to ensure the quality.
Tolerance:
FAQ
1. What kind of files can you receive?
We can receive on Pro-E, CAD,PDF and CAXA ect.,
2. How much does the parts cost?
We will check the drawing with requirement carefully, and send our competitive offer according to customer's requirement.
3. Can You Provide free Sample?
Yes, we can provide 1-3 piece free sample for standard parts to customer for testing.according to your drawing
4. How to order?
(a) Please send us drawing or sample(non-standard parts) or series number(standard parts).
We can sign NDA if the file is belongs to intellectual property and confidential.
(b) We evaluate the drawing and requirement immediately.
(c) We try to send the offer at the same day back to customer.
(d) If we both agreed on the offer, for trade rules, we accept 30% Deposit before order, and 70% Balance when shipment is taking.Then we can start manufacturing or sample process.
(e) Our production time usually takes 7 working days,sample process takes 3-5 days. It depends on order quanity and product itself.
(f) We can ship the parts by express,air,sea according to your need
Look forward to provide our competitive price and perfect quality
to you soon!!!