Home Companies Zhangjiagang Dehai Boiler Co., Ltd

Insulation Heating Water Wall Header Natural Gas Boiler Industrial High Safety

Zhangjiagang Dehai Boiler Co., Ltd
Active Member

Contact Us

[China] country

Address: No.1 Huangqi 1st Road, Lixiang Village, Yangshe Town, Zhangjiagang City

Contact name:Edwin

Inquir Now

Zhangjiagang Dehai Boiler Co., Ltd

Insulation Heating Water Wall Header Natural Gas Boiler Industrial High Safety

Country/Region china
Categories Boiler Parts
InquireNow

Product Details

Insulation Heating Water Wall Header Natural Gas Boiler Industrial High Safety
 
Heat Insulation Natural Gas Boiler Header Astm Certification Manufacturer High Quality

 

Natural Gas Boiler Header Details​

 

1. The pressures and temperatures that headers have to withstand depend on the component to which they are connected.

2. A header connected to an economizer or to water wall panels is subject to less severe requirements on the material than a header connected to superheaters or reheaters.
3. Depending on the temperature and pressure of headers, Vallourec supplies tubes in carbon steel to high-alloy ferritic steels such as T/P91 or T/P92, with sizes ranging from 88.9 mm to 406.4 mm.

 

Water Wall Header Attention

 

If there exists straw hat , iron and other sundry in manifold headers, when power plant is running, it is easy to cause boiler stop accidents such as booster.So the header cleanliness must be strictly controlled.

 

Water Wall Header Features

 

1.Headers form an important part of all types of boilers. Steam from the generating tubes is collected in headers which are therefore always under pressure. This pressure may vary from 300 psi to 2000 psi.

2. Since headers are always under pressure, the utmost care is taken by us while fabricating them. Depending on the generating capacity of the boiler the header sizes fabricated by us vary from 100 mm to 600 mm NB. The stubs of various sizes are very carefully welded to the main body of the header to provide the desired openings from the headers
3. Bevelling and weld preparation of stubs duly tack-welded to the main body of the header are first shown to Chief Inspector of Boilers for his approval and once again the stubs fully welded with main body are shown to Chief Inspector of Boilers under hydraulic pressure, varying from 1000 to 3000 psi as required by the specifications.
4. The headers are stamped by Chief Inspector of Boilers before they leave our manufacturing plant. We also weld skubolets and weldolets in place of stubs.

 

Water Wall Header Specification

 

Diameter(OD)¢76mm~¢914mm
Length(Max)23000mm
Temperature(℃)300~1500

 

Product Name
Membrane Water Wall Header for boiler
Applied Area
boiler membrane water wall
Body Material
- Carbon Steel : 20#, 20G, A192, A-1
- Alloy Steel : 15CrMoG, 12Cr1MoVG, T11, T22
Nozzle Tube Material
As per design
Standard
China GB, ASME
Manufacturer Grade
China A Grade, ABS Certificated, TUV Certificated
Working Temperature
depends on material
Working Pressure
1.6 MPa ~ 15 MPa
Body Thickness
As per design
Body Diameter
As per design
Body Length
As per design
Welding
SMAW, SAW, GTAW (TIG)
Welding NDT
- Body : 100% RT or 100% UT
- Nozzle tube > Φ108 : > 20% MT, 100% UT
- Nozzle tube <= Φ108 : > 20% MT

 

Detailed Picture

 

Hot Products

Insulation Heating Water Wall Header Natural Gas Boiler Industrial High Safety Heat Insulation ...
Economical Economizer Boiler Manifold Headers 100-600mm NB Size High Efficiency Boiler Economizer ...
Collecting Box Copper Boiler Steam Header , Boiler Tube Ensuring Uniform Heating Boiler Membrane ...
Fire Proof Biogass Boiler Manifold Headers Water Tube Heavy Duty Fire proof biogass boiler header ...
Heat Exchange Boiler Steam Header , Steam Distribution Header Economizer Connected Heat Exchange ...
Alloy Steel Boiler Manifold Headers Advanced Welding 300℃~1500℃ Temp High Quality Boiler Header ...